25
Appendix C
System Test
Test no.
Test title
————————————————————————
1
Battery backup
2
Real-time clock
3
EEPROM
4
Inmarsat IDs
5
+15V DC
6
Factory reset
7
TX inhibited
8
Distress button 1
9
Distress button 2
10
TELEX input
11
Printer input
12
ADE input
13
NMEA position input
14
Service input
15
NMEA gyro input
16
Printer on-line
17
Heading known
18
Position known
19
Ocean region valid
20
Control unit found
21
SCANBUS data transmission
22
SCANBUS data reception
23
TUBUS
24
MODEM found
25
MODEM active
26
MODEM RX SU ratio
27
SPS found
28
SPS RX IF
29
SPS RX filter
30
SPS TX IF
31
SPS TX filter
32
SPS DSP
33
SPS OCXO
34
SPS RX S/N ratio
35
ADE found
36
Down converter locked
37
Tracking receiver locked
38
Up converter locked
39
HPA failed
40
HPA timed-out
41
HPA stopped
42
ADE ready
43
ADE idle
44
Aerial direction
45
ADE azimuth rate-sensor
46
ADE elevation rate-sensor
47
ADE cross-elevation rate-sensor
48
ADE inclinometer
49
ADE fluxgate
50
ADE connection stability
51
VDP running
52
VDP MODEM detected
53
VDP clock detected
54
PAX found
55
PAX running
56
PAX phone 1 activity
57
PAX phone 2 activity
58
PAX phone 1 PABX setting
59
PAX phone 2 PABX setting
60
PAX phone 1 line noise
61
PAX phone 2 line noise
62
SPS OCXO warm
63
ADE failed
64
ADE control input
65
ADE control output
66
PAX interface
Result no.
Result Title
———————————————————————
0
Invalid
1
Passed
2
Failed
3
Not present
4
Not used
5
Input static
6
Wrong state