Installation
2022/04
Operating instructions Concept PDG 2906 peristaltic dosing pump
27 / 44
The jumpers should be fitted as follows:
T 1 2 3 4 5 6 7 8 P
Important information
To ensure that there is no transmission interference, it is essential to activate the
terminating resistor on the two outermost devices.
Setting a jumper in position “T” activates the terminating resistor on the dosing
pump.
The jumpers are set.
1.1.14
Additional pump electrical connection
Irreparable damage to the device!
The supply voltage for the control unit and additional pump must be in phase!
Two different voltages!
•
Terminals 1-6: 230 V
•
Terminals 9-15: Safety Extra Low Voltage
The two voltages must be kept separate in accordance with regulations.