Installation
2022/04
Operating instructions Concept PDG 2906 peristaltic dosing pump
20 / 44
1.1.6
Fit tube kit
Remove the pump housing cover (1).
Remove the rotor cover (2).
Rotate the rotor into angled “D” position.
Place the tube in position to the left of the rotor.
Slide the tube holder into the guide on the left (
).
Use long-nose pliers or a rotor key to rotate the rotor
clockwise.
While turning the rotor, press the pump tube into the
guide.
Slide the tube holder fully into both guides.
Check that the tube holder sits flush.
Rotate the rotor several times to align the pump
tube.
Refit the rotor cover (2).
Refit the pump housing cover (1).
The tube kit is fitted.