Door Station Installation Guide
38
1) Connect the cables from the wall and module-connecting line 1 to the corresponding
interfaces of the main unit, then place the main unit into the upper grid.
2) Connect the other end of the module-connecting line 1 to the input interface of the sub
module. Connect all sub modules via module-connecting lines.
3) Organize the cable with cable tie in the package. The suggested cable connection picture as
shown below.
Figure 3-49 Line Connection Effect Picture
9. Insert the modules into the frame after wiring. The main unit must be placed in the top grid on
the left.