Door Station Installation Guide
29
1) Connect the lines and module-connecting line 1 to the corresponding interfaces of the main
unit, then place the main unit into the upper grid.
2) Connect the other end of the module-connecting line 1 to the input interface of the sub
module. Connect two sub modules via module-connecting line 2.
3) Organize the cables with cable tie in the package. The suggested cable connection picture as
shown below.
Figure 3-34 Line Connection Effect Picture
7. Insert the modules into the frame after wiring. The main unit must be placed in the top grid.
Figure 3-35 Insert the Modules into the Frame
8. Use the hexagon wrench in the package to fix the cover onto the frame.