
Door Station Installation Guide
19
Figure 3-18 Placement of Lines
6. Connect the cables.
1) Connect the lines and module-connecting line to the corresponding interfaces of the main
unit, then place the main unit into the upper grid.
2) Connect the other end of the module-connecting line to the input interface of the sub
module.
3) Organize the cable with cable tie in the package. The suggested cable connection picture as
shown below.