For the projecting and construction of this machine all the criteria and details meeting the main
safety requirements requested by the Machines Directive 98/37/CE, Low Voltage Directive
73/23/CEE, modified by the directive 93/68/CEE, and by the Electromagnetic Compatibility
Directive 89/336/CEE and following modifications have been used. The harmonized rule EN
12159 has been applied.
An accurate analysis from the manufacturer has allowed the avoidance of the main part of both
the foreseen and the reasonably foreseeable risks related to the conditions for the machine use.
A complete documentation of the safety precautions taken is given in the technical handbook of
the machine, deposited at
SAFI
premises.
The manufacturer recommends to follow the instructions given in this manual carefully and to
keep to the safety regulations at work in force. This recommendation is extended to the use of
the safety guards provided, both those integrated and those added to the machine.
ATTENTION:
Do not wear large clothes, ties, neck laces, watches which might get
entangled in moving parts of the machine.
NOTE:
SAFI S.r.l. does not assume the
responsibility
for any damages to
properties nor injuries to people or domestic animals arising from the non-
observance of the safety rules and recommendations contained in the
documentation provided.
The user, for his/her safety and for those who are working in the vicinity, must respect the safety
rules required by the type of equipment used, by the working environment and by the effective
operating conditions.
The use is subordinated to the respect of the following safety standards.
The basement must be installed on a sufficiently load-bearing supporting plane,
according to loads specifications.
•
The whole ground area of the equipment must be adequately fenced.
•
Access to the operating zone must be strictly reserved to the personnel in charge only.
•
Operating personnel must wear the safety helmet.
Check the stability of the wall before securing the mast to it, according to the loads
specifications given in chapter. Make sure that the access to loading and unloading floors is
adequately fenced and that those fences can be removed only after the elevator has reached
the level floor.
•
The machine must be erected in the definitive position by the yard foreman who must
verify the respect of all the safety rules.
•
Check and verify the load bearing of the machine supporting plane and the distance
from the wall before the erection.
•
All the operations of mounting, dismantling, use and maintenance outside the elevator
car must be carried out by personnel specifically authorized.
•
Access to the ground area -reserved to assembly operations of the equipment- must be
precluded and
signaled
by means of adequate no admittance warning signs.
•
Install special warning signs.
•
Carry out routine and scheduled maintenance operations on a regular basis.
Summary of Contents for VISION AS 300
Page 2: ......
Page 4: ......
Page 43: ...LIFT MODEL VISION AS 300 Rev001 7 4 Fig 7 1 Dimension...
Page 68: ...LIFT MODEL VISION AS 300 Rev001 12 1 12 WIRING DIAGRAMS Fig 12 1 Wiring diagram Power supply...
Page 69: ...LIFT MODEL VISION AS 300 Rev001 12 1 Fig 12 2 Wiring diagram Motor power supply...
Page 70: ...LIFT MODEL VISION AS 300 Rev001 12 2 Fig 12 3 Wiring diagram Emergency circuit...
Page 71: ...LIFT MODEL VISION AS 300 Rev001 12 3 Fig 12 4 Wiring diagram Auxiliary...
Page 72: ...LIFT MODEL VISION AS 300 Rev001 12 4 Fig 12 5 4 Wiring diagram Auxiliary PLC logo expans...
Page 73: ...LIFT MODEL VISION AS 300 Rev001 12 5 Fig 12 6 Auxiliary circuit...
Page 74: ...LIFT MODEL VISION AS 300 Rev001 12 6 Fig 12 7 Wiring diagram Connectors C1 C2 C3...
Page 75: ...LIFT MODEL VISION AS 300 Rev001 12 7 Fig 12 8 Wiring diagram Terminal box electric panel...
Page 76: ...LIFT MODEL VISION AS 300 Rev001 12 8 Fig 12 9 Wiring diagram Cable call floor...
Page 77: ...LIFT MODEL VISION AS 300 Rev001 12 9 Fig 12 10 Wiring diagram Floors call connection...
Page 78: ...LIFT MODEL VISION AS 300 Rev001 12 10 Fig 12 11 Wiring diagram Box floor call connection...
Page 79: ...LIFT MODEL VISION AS 300 Rev001 12 11 Fig 12 12 Wiring diagram Box Fencing connection...
Page 80: ...LIFT MODEL VISION AS 300 Rev001 12 12 Fig 12 13 Wiring diagram Cable fancing call...
Page 81: ...LIFT MODEL VISION AS 300 Rev001 12 13 Fig 12 14 Main electrical box components...
Page 82: ...LIFT MODEL VISION AS 300 Rev001 12 14 Fig 12 15 Material list 1...
Page 83: ...LIFT MODEL VISION AS 300 Rev001 12 15 Fig 12 16 Material list 2...