REV01 - Aug. 06
Ideas with Passion
6.1 Multi-way valve
1/9
Touch Plus multi-way valve opening operating diagram
2
uv
sg
3
4
1
PHASE 2
STEAM
5
PHASE -1
MICRO 2
PRE-LOAD
PHASE 0
MICRO 1 and 2
DRAIN UNIT
PHASE +2
MICRO 2
HOT WATER
PHASE+1
MICRO 1
COFFEE
1=
hot w
ater and steam heater outlet
2=
hot w
ater inlet f
rom cof
fee/w
ater heater
3=
hot w
ater outlet to br
ew gr
oup
4=
hot w
ater outlet to v
alv
e
5=
steam inlet f
rom steam heater
uv=
steam outlet to cappuc
cinator
e
sg=
unit w
ater dr
ain
2
uv
sg
3
4
1
5
2
uv
sg
3
4
1
5
2
uv
sg
3
4
1
5
2
uv
sg
3
4
1
5
MICRO 1
Two f
actors combine to giv
e the fiv
e phases of the multiw
ay v
alv
e:
1) Activ
ation (or not) of two micr
oswi
tches on the mul
tiv
alv
e
2) Dir
ection of r
otation of the multiv
alv
e
PRIMEA Section 06
Heater
pin
Pr
essblock
Heater 2
cappuc
cina
-
tor
e
Milk container
Autocappuc
cino v
alv
e
Mul
ti-
w
ay
Heater 1
Heater 1
Summary of Contents for Prime line
Page 3: ...REV01 Aug 06 Ideas with Passion SECTION 1 INTRODUCTION REV 00 PRIMEA Section 01...
Page 5: ...REV01 Aug 06 Ideas with Passion SECTION 2 TECHNICAL DATA REV 00 PRIMEA Section 02...
Page 9: ...REV01 Aug 06 Ideas with Passion SECTION 3 BRIEF INSTRUCTIONS REV 01 PRIMEA Section 03...
Page 15: ...REV01 Aug 06 Ideas with Passion SECTION 4 DIAGRAMS REV 00 PRIMEA Section 04...
Page 22: ...REV01 Aug 06 Ideas with Passion SECTION 5 TROUBLESHOOTING REV 01 PRIMEA Section 05...
Page 43: ...REV01 Aug 06 Ideas with Passion SECTION 6 OPERATING LOGIC REV 01 PRIMEA Section 05...
Page 76: ...REV01 Aug 06 Ideas with Passion SECTION 8 SERVICE SCHEDULE REV 01 PRIMEA Section 08...