REV01 - Aug. 06
Ideas with Passion
2.1 Product and component technical data
Power supply and output:
230V AC, 50 Hz, 1500 W
Temperature control:
2 (NTC) variable resistor sensor - transmits the value
to the electronic board
Safety system:
Thermostat at 170°C with manual reset on
both h 192° fuse
Coffee heat exchanger output:
Stainless steel
Steam heat exchanger output:
Stainless steel
1300 W - to dispense coffee and hot water
1090 W - to dispense steam
Motorized tank:
24v stepper motor
Water level sensor:
Capacitive sensor
Gearmotor:
DC motor (24 V) in two directions
of rotation
Cup warmer plate:
Enabled via display “MENU
Type PTC
Pump:
Ulk a reciprocating piston type with thermal cutout at
100°C
48W, 230V, 60 Hz, Type EP5 GW
approx. 13-15 bar
Pressure relief valve:
Opening at approx. 17-19 bar
Water filter:
In tank
Coffee grinder:
DC motor with ceramic plate
grinders
Coffee dose control:
Hall sensor - Pulse control. Optional
coffee strength adjustment from approx. 7 - 10.5 g.
Multi-function valve:
Beverage selection control
Cappuccino valve:
Enables automatic frothing
Amps:
During heating phase- approx. 5.6 A
Energy consumption:
In Stand -By approx. 2.9 Wh
In machine ready status, no beverages dispensed 53Wh
Dimensions: l x h x d in mm:
350/390/430
Weight:
14 kg
Water tank capacity:
1,75 0.32 l.
Coffee container capacity:
350 g. coffee in beans
Milk container capacity:
0.32 l.
Heat exchanger capacity:
Approx. 10 cc
Water circuit filling time:
Approx. 10 sec on first filling cycle
Heating time:
Approx. 45 sec.
Dispensed beverage temperature:
Approx. 73°C - 83°C
Grinding time:
Approx. 8-10 sec.
1/3
PRIMEA Section 02
Summary of Contents for Prime line
Page 3: ...REV01 Aug 06 Ideas with Passion SECTION 1 INTRODUCTION REV 00 PRIMEA Section 01...
Page 5: ...REV01 Aug 06 Ideas with Passion SECTION 2 TECHNICAL DATA REV 00 PRIMEA Section 02...
Page 9: ...REV01 Aug 06 Ideas with Passion SECTION 3 BRIEF INSTRUCTIONS REV 01 PRIMEA Section 03...
Page 15: ...REV01 Aug 06 Ideas with Passion SECTION 4 DIAGRAMS REV 00 PRIMEA Section 04...
Page 22: ...REV01 Aug 06 Ideas with Passion SECTION 5 TROUBLESHOOTING REV 01 PRIMEA Section 05...
Page 43: ...REV01 Aug 06 Ideas with Passion SECTION 6 OPERATING LOGIC REV 01 PRIMEA Section 05...
Page 76: ...REV01 Aug 06 Ideas with Passion SECTION 8 SERVICE SCHEDULE REV 01 PRIMEA Section 08...