
8 - 7
176.12
.A03
Revision 01 Date 14.11.2001
MAINTENANCE
8
•
•
•
•
•
•
17
19
FIGURE 8.1.2.1/B - REMOVING THE EXTRUDER FILTER
T0623
6
5
7
10
- Turn the unit outwards as shown in figure 8.3.1.2/C,
since the extruder mount (19) is hinged to the center of
the base.
The extruder head can now be opened to gain access
to the filter and remove the auger. This operation is to be
performed when the extruder has reached its operating
temperature. When it is cold, it is impossible to remove
the parts because of the hardened plastic.
Proceed as follows:
- Shut off the electricity supply and remove the cables
from the terminal block (9). These cables are for the
electric heating elements in the extruder head (10).
- Remove the screws (11 & 12) so that the cylinder (13)
can be taken out.
- Remove the nuts (14) which hold the extruder head in
place.
- Remove the head (10) by prying it out with two
screwdrivers.
- The filter (16) can now be removed.
T0624
FIGURE 8.1.2.1/C
Summary of Contents for PMV 224
Page 2: ...TABLE OF CONTENTS 176 12 A03 0 2 Revision 01 Date 14 11 2001 ...
Page 4: ...TABLE OF CONTENTS 176 12 A03 0 4 Revision 01 Date 14 11 2001 ...
Page 34: ...2 22 176 12 A03 Revision 01 Date 14 11 2001 2 MAIN FEATURES ...
Page 42: ...3 8 176 12 A03 Revision 01 Date 14 11 2001 SAFETY EQUIPMENT AND PRECAUTIONS 3 ...
Page 64: ...5 4 5 START UP 176 12 A03 Revision 01 Date 14 11 2001 ...
Page 70: ...6 6 176 12 A03 Revision 01 Date 14 11 2001 6 OPERATING INSTRUCTIONS ...
Page 126: ...8 30 176 12 A03 Revision 01 Date 14 11 2001 8 MAINTENANCE ...
Page 128: ...9 2 176 12 A03 Revision 01 Date 14 11 2001 9 DECOMMISSIONING ...