
TITAN
-
manuale di installazione, conduzione e manutenzione
-
Installation and maintenance manual
41
Component check-list for hygienic matters
CONTROLLED ELEMENT
ACTIVITY
PERIODICITY
external air intake and
expulsion gratings
- cleaning of grating
- cleaning of bird net
- check of positioning against the surrounding elements
- check of the environmental conditions
every year
gates
- lubrication of levers and articulated joints
every year
cell filters (pre-filters)
partially regenerable in dry
conditions
- visual check of wear and clogging
- a) cleaning according to what recommended by the
manufacturer
- b) complete replacement according to what described in
this manual (seal the containers before sending to
disposal)
every three
months
automatic
signaling
floppy bag filters
not regenerable
- visual check of the possible tearing of the highest joint
point of the bag to the frame
- replacement when reaching the difference of pressure of
250 Pa approx. (seal in containers before sending to
disposal)
every three
months
automatic
signaling
rigid bag filters
not regenerable
- replacement when reaching the difference of pressure of
400 Pa approx. (seal in containers before sending to
disposal)
automatic
signaling
absolute filters
not regenerable
- replacement when reaching the difference of pressure of
600 Pa approx. (seal in containers before sending to
disposal)
automatic
signaling
activated carbon filters
not regenerable
- level of clogging of these filters can be detected hardly
(seal in containers before sanding to disposal)
check every
month
heat regenerator
- maintenance in compliance with what required by the
Manufacturer's manual
as per manual
heat exchange batteries
- cleaning of the bladed pack according to the procedures
described in this manual
every three
months
water collection trays
- check of the absence of water stagnation or of the
presence of mould or algae
- check of the effectiveness of drain-traps
- cleaning and disinfection by steam jet
twice a week
every six
months
every month
humidifier
- check of the humidification system and execution of the
maintenance and cleaning programs indicated by the
Manufacturer or described in this manual.
twice a week
drop trap
- cleaning and scaling
every three
months
fan
- visual check of the conditions of impeller blades
- lubrication of supports of impeller shaft
every six
months
transmission device
- check of wear and tension of belts and their possible
replacement
- check of pulley alignment
every month
regulation devices
- control of operation of thermostats, motor-operated
valves, temperature and humidity sensors, etc.
every year
air delivery openings and exit
cones and air recollection
gratings
- visual control of possible dirty conditions and, if
necessary, cleaning by steam or bicarbonate powder jet
and disinfect with disinfectant in watery solution.
every year
air ducts
- inspect with video camera system and, if necessary,
cleaning by steam or bicarbonate powder jet and disinfect
with disinfectant in watery solution.
every year