
To the dealer: inspect the machine thoroughly after assembly to assure it is
functioning properly before delivering it to the customer. The following checklist
is a reminder of points to cover. Check off each item as it is found satisfactory or
after proper adjustment is made.
z
Gearbox oil level.
z
Guards and shield properly fastened.
z
Lubrication of grease fittings.
z
All hardware properly tightened.
z
All decals properly located and readable
(see fig. 2)
.
z
Blades properly installed, blade bolts & nuts tightened.
z
Overall condition (touch up scratches, clean and polish).
z
Test run, check for excessive vibration or overheating of bearings.
z
Operator's Manual.
Review the operator's manual with the customer. Explain the following:
z
Warranty.
z
Safe operation and service.
z
Correct machine installation and operation.
z
Daily and periodic lubrication, maintenance and inspections.
z
Troubleshooting.
z
Operational procedures and storage.
z
Parts and service.
z
Remove and fill out the Delivery and Warranty Registration form.
z
Give customer the operator's manual and encourage the customer to read the
manual carefully.
IMPORTANT: warranty is not valid unless Delivery and Warranty Registration
Form in operator's manual is completed in detail and mailed to the Company.
Model Number: __________
Serial Number: __________
Delivery Date: __________
Dealer's Signature: __________
7 - PRE-DELIVERY CHECKLIST
7 - PRE-DELIVERY CHECKLIST
7 - PRE-DELIVERY CHECKLIST
7 - PRE-DELIVERY CHECKLIST
CYCLONE 'C50'
OPERATOR'S MANUAL
SAFETY PRECAUTIONS
35
ROTOMEC