BRP-Rotax
INSTALLATION MANUAL
ASSEMBLY OF PADDLE SHIFT
SYSTEM
Tools required:
• Allen key 6 mm
• Allen key 5 mm
Step
Procedure
1
Install spacer (pos. 1) into the appro-
priate bore (pos. 2) of the engine
housing.
Figure 7.10
1
Spacer
2
Appropriate bore
Step
Procedure
2
Install washer (pos. 1) on one of the
two Bowden cables (pos. 2).
Figure 7.11
1
Washer
2
Bowden cable
Step
Procedure
3
Mount Bowden cable (pos. 2) with
washer (pos. 1) onto the shift contact
guidance (pos. 3).
Figure 7.12
1
Washer
2
Bowden cable
3
Shift contact
guidance
Step
Procedure
4
Mount Bowden cable with shift contact
guidance (pos. 1) to the retaining plate
(pos. 2).
Effectivity: 125 MAX DD2 evo
Page 7
Edition: September 01 2019
Summary of Contents for 125 MAX DD2 evo
Page 2: ...General information BRP Rotax recommends products of the following companies...
Page 63: ...Operator s Manual...
Page 65: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 67: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 73: ...Page 6 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 81: ...Page 8 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 113: ...Page 12 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 119: ......