Figure 7.8: Cable tie
1
Cable tie
2
Black hose
3
Cable tie
Step
Procedure
8
Attach the 220 mm pressure line (pos.
1) to the magnetic valve (pos. 3). Se-
cure the pressure line on the magnetic
valve with a tie wrap (pos. 4). Attach
the other end of the pressure line to
the exhaust valve (pos. 2).
Figure 7.9
1
Pressure line
2
Exhaust valve
3
Magnetic valve
4
Cable tie
Page 6
Edition: September 01 2019
Effectivity: 125 MAX DD2 evo
Summary of Contents for 125 MAX DD2 evo
Page 2: ...General information BRP Rotax recommends products of the following companies...
Page 63: ...Operator s Manual...
Page 65: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 67: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 73: ...Page 6 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 81: ...Page 8 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 113: ...Page 12 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 119: ......