11. Assembly
39
Rev.D 2013_03_en
11.5 Prepare the runways
Cables and sheaves are prefitted in the run-
ways and secured by transport locks.
The runways can be fitted with the approach
area on the left or right.
Always attach the fixed runway to the lift col-
umn with the control unit.
1.
Set down both runways onto stable wood
beams at the installation site with a distance of
around. 0.9 m between them.
Use the A to D markings. Label "A
“of the fixed
runway to the power supply.
2.
Pull out the cables and pneumatic lines on the
front ends of the runways. These must be rolled
in under the runways and secured).
33
3.
Insert the cables into the cable sheaves of the
runways. Make sure they are correctly positioned
in the cable sheaves.
4.
Lubricate the cable sheave grooves on both
front ends of the fixed runways (for grease
see
Chapter 9.4).
34
5.
Insert the fitting (metal guard) for flexible hoses
from inside and outside into the fixed runway
and tighten.
11.6 Prepare the cross beams
1.
Position both cross beams under the runway
beams at the ends of the runways. Make sure
that markings A to D match up.
2.
Pull out the cable sheaves on the right and left
of the two cross beams.
35
3.
On each cross beam, remove the M8 screws
and (1) and the outer guides (2)
(Guide = twist lock).
i
i
i