9. Maintenance and repair
29
Rev.D 2013_03_en
Monthly maintenance
1.
Turn the main switch to OFF ("OFF“ setting) and
lock with a padlock.
2.
Check whether the runways and rolling jacks
are horizontally aligned during lifting and lower-
ing and move up and down. Re-adjust stretched
cables (
Chapter 13. Commissioning).
3.
Check whether screw fittings have come loose.
This applies in particular to screw fittings be-
tween drive-on surfaces and cross beams.
4.
Check the hydraulic oil level (Hydraulic tank). If
necessary, refill with approved hydraulic oil
(
Chapter 9.4) ("max“ mark. Empty tank capac-
ity 11 liters).
5.
Inspect the tank cover of the hydraulic tank. The
vent cap must be clean so that no vacuum can
form.
Clean if necessary.
6.
Check hydraulic component seals (visual in-
spection).
7.
Turn main switch to ON ("ON“ setting).
8.
Check that control buttons and switches func-
tion properly.
9.
Carry out a function test with and without load.
10.
Complete a maintenance report (
Annex).
Six month maintenance
1.
Raise lift and rolling jacks.
2.
Turn main switch to OFF ("OFF“ setting) and
lock with a padlock.
3.
Lubricate post lift with approved lubricant
(
Chapter 9.4).
●
Fig. 25: 4x Cross beam grease fitting with
grease press
●
Fig. 26: 8x Runways grease fitting for main lift
with grease press
●
Fig. 27: 2x Rolling jack grease fitting with
grease press
●
Fig. 28: 2x Rolling jack grease fitting with
grease press
●
Lightly grease the rolling jack slides running
surfaces.
4.
Turn
the main switch on ("ON“ setting).
5.
Conduct function test. Lower lift and rolling jack
completely.
6.
Complete a maintenance report (
Attach-
ment).
25
26
27
28