10.
Transport
, Storage
36
Rev. D 2013_03_en
10.2 Offloading
7.
Inspect the shipment for any shipping or
transport damage. Immediately report any dam-
age to your supervisor and to the transport firm.
8.
If there is any transport damage, contact the
transport firm.
9.
Transport the packing unit to the installation
site. This must conform to the approved envi-
ronmental conditions (
Chapter 7.
Technical data).
10.
Unfasten the transport locks for the large parts
on the front of the packing unit.
11.
Offload the runways and cross beams and set
down carefully.
Recommended: Raise the runways and cross
beams slightly, for example set down onto
stable wood beams. This will also enable you
to better route the pneumatic lines and elec-
trical cables later.
12.
Remove all other components from the pallet
and set down carefully.
13.
Inspect the supplied parts according to the
packing list provided.
14.
Dispose of packaging in an environmentally
friendly manner, in compliance with the regula-
tions applicable in your country (
Chapter 16.
Disposal).
10.3 Storage
Lift components must always be stored in a dry
place (no corrosion protection).
Recommended Storage Conditions
Ambient temperature:
-5 ... +50
Relative humidity,
30 % ... 95 %
with condensation, at 20 °C
The manufacturer provides no warranty for
corrosion damage caused by incorrect stor-
age.
i
i