background image

scale:

title:

drawing-no.:

ISO-Projektion Methode 1

series:

assembly instr.:

panel piercing:

crimp

insert:
cable:

PD_FB_01

general

tolerance

1

2

3

4

A

B

C

D

E

F

A

B

C

D

E

F

1

2

3

4

-METRIC-

AaBbCcDdEeFfGgHhIiJjKkLlMmNnOoPpQqRrSsTtUuVvWwXxYyZzÄäÖöÜüß1234567890

vertraulich / 

confidential

©

 ROSENBERGER HOCHFREQUENZTECHNIK GMBH & Co. KG or THIRD PARTY

The reproduction, distribution and utilization of this document as well as the communication

of its contents to others without express authorization by the owner or rights-holder is prohibited.

Offenders can be held liable. All rights reserved in the event of the grant of patent, utility model or design.

Z Mantelschnitt

Abstand

---

ISO 2768

---

mH

         1:1 

         ---

         HVR50

         RN_111-01

         ---

         ---

HVR50 Kabelseite 90°

HVR50 cable side 90°

.

  .

MA_HV0077

 sheet:

      3

 of: 

  

14

 remarks: 

.

 rev. change-no

name

date

400 17-0927

P_Teichmann

24.07.2017

500 18-0036

P_Teichmann

17.01.2018

600 18-1055

S_Keiner

13.07.2018

700 19-1162

C_Thomas

24.01.2020

800 20-0575

E_Meltzer

13.03.2020

a00 21-s133

M_Piffath

30.11.2021

appr.

07.12.2021 I_Zanolla

check.

30.11.2021 A_Beicht

drawn

09.11.2016 T_Stockhamme

date

name

Kabelquerschnitt

cable cross

section

(mm²)

Z

(mm)

( 0.5)

2x4

25.2

2x6

25.2

Kabelquerschnitt

cable cross section

(mm²)

Abstand

spacing

(mm) 

( 0.6)

2x4

24

2x6

24

3)

 

Mantel (Z) von Kabel 

nach Tabelle abisolieren.

       

Cut insulation coat (Z) of cable 

acc. to table.       

4a)

 

Stützhülse 

H

 auf Kabel 

E

 schieben. 

          Schirmgeflecht muss flach anliegen und darf nicht zerstört werden.

          Position der Stützhülse beachten. Abstand nach Tabelle.

        

Move retaining sleeve 

H

 on cable 

E

          Make sure the braided shielding is flat and must not be destroyed.

          Observe position of retaining sleeve. Distance acc. to table.

4b)

 

Schirmfolie entfernen

        

Remove shielding foil

insulation coat cut

Schirmfolie / 

shielding foil

E

Schirmfolie / 

shielding foil

E

H

spacing

Summary of Contents for HVR50

Page 1: ... 2 Innenleiter inner conductor D 1 Außenleiter outer conductor Einzelteile single parts E 1 Kabel cable F 1 Kabeldichtung cable seal G 1 Abschlusskappe end cap H 1 Stützhülse retaining sleeve I 1 Isolierteil insulator Gesamtbaugruppe 2 pol Kuppler assembly two pole jack Einzel Baugruppenübersicht subassembly overview Farbdarstellung muss nicht den Bauteilen entsprechen Colors are not necessarily c...

Page 2: ...te 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_Stockhamme date name Kabelquerschnitt cable cross section mm Validierte Kabel validated cable Zuschnittzugabe adding blank mm ...

Page 3: ...e 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_Stockhamme date name Kabelquerschnitt cable cross section mm Z mm 0 5 2x4 25 2 2x6 25 2 Kabelquerschnitt cable cross section mm...

Page 4: ...1 1 HVR50 RN_111 01 HVR50 Kabelseite 90 HVR50 cable side 90 MA_HV0077 sheet 4 of 14 remarks rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_Stockhamme da...

Page 5: ...768 mH 5 1 1 1 HVR50 RN_111 01 HVR50 Kabelseite 90 HVR50 cable side 90 MA_HV0077 sheet 5 of 14 remarks rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_St...

Page 6: ... N 2x4 Hanke 951 07775 201 001 4 15 2 55 5 1 4 15 310 2x6 Hanke 951 07775 201 001 4 15 2 75 5 1 4 6 450 Leitungscrimp cable crimp Mantelcrimp coat crimp ISO 2768 mH 1 1 2 1 HVR50 RN_111 01 HVR50 Kabelseite 90 HVR50 cable side 90 MA_HV0077 sheet 6 of 14 remarks rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C...

Page 7: ... rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_Stockhamme date name Farbe colour Pin Pol rot red 1 schwarz black 2 8a Innenleiter C der vormontierten K...

Page 8: ... 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_Stockhamme date name 9 Vormontierte Kabelbaugruppe orientiert bis Anschlag in Außenleiter D einschieben Ein verdrehen schräg stecken oder zurückziehen der Kabelbaugruppe ist während der Montage nich...

Page 9: ... P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_Stockhamme date name Kabel querschnitt cable cross section mm Hersteller manufacturer Werkzeugnummer tool number CH mm 0 1 0 05 CBM mm 0 2 C...

Page 10: ... HVR50 Kabelseite 90 HVR50 cable side 90 MA_HV0077 sheet 10 of 14 remarks rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_Stockhamme date name Außenleite...

Page 11: ... rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_Stockhamme date name 13 Die gecrimpte Außenleiter Baugruppe D orientiert bis Anschlag in Gehäuse A einsc...

Page 12: ...the grant of patent utility model or design 1 5 0 2 0 2 16 0 05 0 05 A 20 0 1 0 1 2 5 0 1 0 1 0 2x45 30 1 5 0 1 0 1 ISO 2768 mH 1 1 3 1 HVR50 RN_111 01 HVR50 Kabelseite 90 HVR50 cable side 90 MA_HV0077 sheet 12 of 14 remarks rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Mel...

Page 13: ...l or design 1 0 5 0 5 ISO 2768 mH 1 1 HVR50 RN_111 01 HVR50 Kabelseite 90 HVR50 cable side 90 MA_HV0077 sheet 13 of 14 remarks rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beic...

Page 14: ...ISO 2768 mH 1 1 HVR50 RN_111 01 HVR50 Kabelseite 90 HVR50 cable side 90 MA_HV0077 sheet 14 of 14 remarks rev change no name date 400 17 0927 P_Teichmann 24 07 2017 500 18 0036 P_Teichmann 17 01 2018 600 18 1055 S_Keiner 13 07 2018 700 19 1162 C_Thomas 24 01 2020 800 20 0575 E_Meltzer 13 03 2020 a00 21 s133 M_Piffath 30 11 2021 appr 07 12 2021 I_Zanolla check 30 11 2021 A_Beicht drawn 09 11 2016 T_...

Reviews: