![Rosemount P300 Installation And Operation Manual Download Page 27](http://html1.mh-extra.com/html/rosemount/p300/p300_installation-and-operation-manual_1487422027.webp)
4-7
Validation Procedures
Loop Test
The loop test feature provides a constant 12 mA current source. To
perform a loop test, use the correct diagram to make the electrical
connections (Figure 4-5 and Figure 4-6) and proceed as follows:
NOTE
The current loop is not polarity sensitive.
FIGURE 4-5. Externally Powered Current
Loop Configuration.
P
300
_1
6A
FIGURE 4-6. Validator-Powered Current
Loop Configuration.
P
3
00
_1
7
A
See Safety Messages on page 4-1 for complete warning information.
Summary of Contents for P300
Page 2: ......
Page 4: ...Rosemount Model P300 Pressure Validator ii ...
Page 14: ...Rosemount Model P300 Pressure Validator 2 6 ...
Page 20: ...Rosemount Model P300 Pressure Validator 3 6 ...
Page 30: ...Rosemount Model P300 Pressure Validator 4 10 ...
Page 34: ...Rosemount Model P300 Pressure Validator 5 4 ...
Page 36: ...Rosemount Model P300 Pressure Validator 6 2 ...
Page 45: ...I 3 Index ...
Page 46: ...Rosemount Model P300 Pressure Validator I 4 ...
Page 47: ... 1 ...