Step 4 - Fixing the Door to the Wall Profiles
1.
Centralise the Door between the Wall Profiles, there must be a minimum of 10mm for fixing.
• Make sure the Magnets on the Door and Frame locate onto each other down the full length of the door.
2. On the inside of the enclosure, with the 2.5mm drill bit (supplied), drill a hole into the Vertical Frame and
Wall Profile approximately 100mm from the top and bottom and one in the centre. Drill 2 holes between
these (5 holes in total).
• Ensure the door is completely vertical (the bubble on the Spirit Level must be in the centre of the 2 lines).
3.
Fasten the Door to the Wall Profiles using the 9mm screws supplied.
4.
Seal the Wall Profiles vertically top to bottom, both internally and externally where they meet the tiles.
IMPORTANT: Failure to carry out stage 4 may result in serious water damage and is not covered under the
terms of the guarantee.
• Allow 24 hours for the sealant to fully cure prior to using the shower.
5. Remove the setting block from the bottom of the door.
②
①
NOTE: 2 people will be required to carry out these operations. Some parts are hidden for clarity reasons.
Equal
Equal
10mm
①
Minimum
④
①
①