![Rohde & Schwarz 1422.0703.02 User Manual Download Page 62](http://html.mh-extra.com/html/rohde-and-schwarz/1422-0703-02/1422-0703-02_user-manual_1477787062.webp)
Putting into Operation
R&S
®
RT-ZD01
19
User Manual 1422.0732.02 ─ 02
c) Using a small screwdriver, turn the "Offset Adjust" screw until the wave-
form meets exactly the 0
V position in the middle of the display.
Fig. 2-5: Adjusting the offset
2.2
Connecting the Probe to the DUT
Shock hazard caused by high voltages
Before connecting the probe to the test circuit, make sure that probe is con-
nected to the measuring instrument and the instrument is properly groun-
ded. Use the auxiliary ground connector if necessary.
Ensure a stable connection between the output leads and the sprung
hooks. Switch off the test circuit while connecting and disconnecting the
sprung hooks.
Always use the slider to open the sprung hook. The finger guard provides
protection. Keep your fingers behind the finger guard.
1. Connect the sprung hooks to the output leads.
2. Using the slider, connect the sprung hooks to the circuit: Connect the red
cable to the more positive voltage level than the black probe cable.
Connecting the Probe to the DUT
www.allice.de
Allice Messtechnik GmbH