![Rockwell Automation Allen-Bradley LDAT Series Installation Instructions Manual Download Page 65](http://html1.mh-extra.com/html/rockwell-automation/allen-bradley-ldat-series/allen-bradley-ldat-series_installation-instructions-manual_1475648065.webp)
LDAT-Series Integrated Linear Thrusters
65
Rockwell Automation Publication LDAT-IN001B-EN-P - March 2020
3.
Bank the bearing rail against the bearing alignment surface.
4.
Torque to values shown in the table starting from the center screws alternating each side.
5.
Slide one bearing puck on to the bearing rail.
Bearing Screw
Size
Torque
N•m (lb•ft)
M3
0.9 (0.67)
M4
1.7 (1.25)
M5
4.5 (3.33)
M6
6.8 (5.00)
M7
14.7 (10.83)
IMPORTANT
Bearing pucks for the frame 30 linear thruster do not have retained ball bearings.
Leave the plastic bearing retainer in place until you are ready to assemble the puck to
the rail. To assemble the frame 30 bearing pucks, do the following.
a.Butt the plastic retainer against end of the rail.
b.Slide the bearing from the retainer to the rail.