![Rockwell Automation Allen-Bradley LDAT Series Installation Instructions Manual Download Page 14](http://html1.mh-extra.com/html/rockwell-automation/allen-bradley-ldat-series/allen-bradley-ldat-series_installation-instructions-manual_1475648014.webp)
14
LDAT-Series Integrated Linear Thrusters
Rockwell Automation Publication LDAT-IN001B-EN-P - March 2020
6.
Install the counter balance and slider-end cap the screws that came with the kit.
7.
Torque to values shown in table.
8.
Screw one 3/8 in. hex nut onto a spring anchor.
9.
Install hex nut and spring anchor assemble in the counter balance bracket.
Torque nut to 33.9 N•m (25.0 lb•ft).
Attach your counter balance spring between the two spring anchor pins.
LDAT Frame Size
S1
S1 Torque
N•m (lb•in)
S2
S2 Torque
N•m (lb•in)
30
M8 x1.25 x 40
13.5 (10.0)
M6 x1.0 x 30
9.0 (6.6)
50
M10 x1.5 x 50
33.9 (25.0)
M10 x1.5 x 30
33.9 (25.0)
75
100
M12 x1.75 x 60
54.8 (40.4)
150
M14 x2.05 x 60
84.7 (62.5)