Rockwell Automation Publication MM-IN001B-EN-P - February 2022
27
Kinetix MMA Asynchronous Main Motors Installation Instructions
2.
Wire the blower assembly. See
based on your blower type.
3.
If applicable, install the blower filters. See
Maintain Blower Filters on page 49
for instructions and additional
information.
Table 20 - Blower Wiring Specifications
1-PH 200…240V AC; 50/60 Hz Axial Blower SH80…SH132
(1)
(1)
The voltage range for SH80 is 220…230V AC; for SH100 and SH132 it is 200…240V AC.
Terminal Connection
Description
L/L1
Line 1
Phase
N/L2
Neutral/Line 2
Neutral
Earth Ground
PE/Ground Symbol
1-PH 200…277V AC; 50/60 Hz Axial Blower SH160
Terminal
Connection
Description
L/L1/U1
Line 1
Phase
N/L2/V1
Neutral/Line 2
Neutral
Earth Ground
PE/Ground Symbol
3-PH 380…480V AC; 50/60 Hz Axial Blower SH160…SH225
Terminal
Connection
Description
L1/U1
Line 1
Phase
L2/V1
Line 2
Phase
L3/W1
Line 3
Phase
Earth Ground
Ground Symbol
3-PH 380…420V AC; 50 Hz / 440…480V AC; 60 Hz Radial Blower SH132…SH225
Terminal
Connection
Description
L1/U1
Line 1
Phase
L2/V1
Line 2
Phase
L3/W1
Line 3
Phase
Earth Ground
Ground Symbol
Input Power Connection
Ground Connection
1-PH 200…240V AC;
50/60 Hz Axial Blower
SH80…SH132
Terminal Box
3-PH 380…480V AC;
50/60 Hz Axial Blower
SH160…SH225
Terminal Box
(Only connect U1, V1, and W1
for the power supply)
Ground
Connection
3-PH 380…420V AC; 50Hz /
440…480V AC; 60Hz
Radial Blower
SH132…SH225
Terminal Box
(See delta and wye wiring
option that follows)
W2 U2 V2
U1
V1 W1
400…460V
50-60Hz
Input Power Connection
1-PH 200…277V AC;
50/60 Hz Axial Blower
SH160
Terminal Box
(Only connect U1 and V1 for
the power supply)
Ground
Connection
L3
W1
L2
V1
L1
U1
W2
U2
V2
V2
U2
W2
U1
L1
V1
W1
L2
L3
Power Supply
Power Supply
Ground Connection