
8
Industrial 18.1" Flat Panel Monitor
Publication 6185-UM001B-EN-P
This section describes how to install the RAC6185 18.1" Flat Panel
Monitor.
When installing the unit, it is important to consider environmental
factors at the site that could affect performance as well as possible
effects from equipment operation on personnel and nearby equipment.
Following the guidelines will help ensure that the monitor will provide
safe and reliable service.
•
Ensure that sufficient
power
is available from a single phase AC
outlet at the site.
•
Ensure that sufficient
space
is available around air inlets and outlets
to provide the circulation necessary for cooling. Never allow air
passages to become obstructed.
•
Ensure that the
ambient air temperature
will not exceed the
specified maximum temperature. A user supplied fan, heat exchanger
or air conditioner may be required to meet this condition in some
installations.
•
Leave the monitor’s
enclosure or cover
in place at all times during
operation. The cover affords protection against high voltages inside
the monitor and inhibits radio-frequency emissions that might
interfere with other equipment.
•
The Federal Communications Commission has prepared a pamphlet
that addresses the problem of
radio frequency interference
to radio
and television reception, which should be consulted in case of
problems with such interference. This publication, “How to Identify
and Resolve Radio/TV Interference Problems” (Stock #004-000-
00345-4) may be obtained from the US Government Printing Office,
Washington, DC 20402.
•
Determine the minimum and maximum ambient
humidity
for the
monitor by consulting the specification sheets at the back of this
manual. Ensure that the humidity of the ambient air will not exceed
these limits. In very dry environments, static charges build up very
readily. Proper grounding of the equipment through the AC power
cord can help reduce the likelihood of static discharges, which may
cause shocks and damage electronic components.
•
Following product hose down, a monitor with a capacitive
touchscreen may not operate properly until the surface area between
the front panel sealing gasket and the touchscreen sensor dries
completely. Drying time can vary from 30 minutes to two hours,
depending on ambient conditions. Furthermore, the monitor should
not be powered up and operational during a hose down.
Installing the RAC6185
18.1" Flat Panel Monitor
(All Models)
Summary of Contents for 6185-D
Page 63: ......