Installation and user manual
Error! Use the Home tab to apply
Titolo 1 to the text that you want to
appear here.
3
1 Introduction
1.1 Introduction and referenced European laws
Dear Customer,
Congratulations for your choice and thank you for the trust you place in our products.
With your purchase you have chosen a technology which is the best combination of energy saving and
functionality, compliant with the strictest European safety standards.
We kindly ask you to read the content of this manual carefully, as you will find useful advice and directions
which will help you operate the boiler effectively and efficiently, increasing its lifespan and your comfort.
We also ask you to preserve these instructions and make them available, when required, to the technician or
installer, to ensure easier and correct boiler installation, operation and maintenance.
For the realization of this product Robur SpA follows these European and Italian laws and standards:
COUNCIL DIRECTIVE 92/42/EEC
of 21 May 1992 on efficiency requirements for new hot-water boilers fired
with liquid or gaseous fuels.
PROJECT CIG E.01.08.929.0
– Gas fired condensing heating appliances with nominal heat input more than
35 kW.
D.P.R. 412
of 26 August 1993 and
D.P.R. 551
of 21 December 1999
– These Italian laws specify the
requirements for the projecting, working and maintenance for rational use of energy.
D.M. 12.04.1996
–Technical standard for fire prevention and for the projecting, working and maintenance for
hot-water boilers fired with gaseous fuels.
R COLLECTION (ISPESL)
– Italian safety standard for hot-water boilers plants with temperature not
exceeding 110° C.
UNI 10845
– Italian standard for flue gas venting system for hot-water boilers fired with gaseous fuels.
The company Robur S.p.A. has the certification UNI EN ISO 9001/2000.
CALDARIA CONDENSING 100 has:
European conformity mark (from the directive 92/42/CEE) issued from the German homologater
The higher energetic efficiency class (from the directive 92/42/CEE) shown with the symbol
;
The better class for NOx emissions (the fifth for the EN 297).
1.2 Warnings
INSTALLATION
In order to ensure safety and correct operation, the installation shall always take place in
full compliance with the applicable Law and with the instructions provided by the Manufacturer, and will
always be carried out by professionally qualified technical personnel only. The equipment shall be installed in
a suitable area, and connected to the heating system in accordance with the applicable Law.
WARRANTY
Full warranty assistance will be ensured only if the appliance is commissioned by Robur Spa
commissioning engineers, please see Terms and Conditions for full details.
The Manufacturer disclaims any and all responsibility resulting from damage due to tampering, improper use
or mistakes made during equipment installation, operation and maintenance. In the event of failure or
breakdown, isolate the equipment and do not try to repair it.
START
UP
The boiler shall be switched on for the first time by approved Corgy registered only. During start-
up, the engineer shall complete the commissioning certificate and leave you a copy, thus starting the
warranty period, whose conditions are specified in the Terms and Conditions available on request.
INSTALLATION
AND
USER
MANUAL
This manual shall be read carefully, in order to use the boiler
correctly and safely, and shall always be kept safely.
92/42/CEE
92/42/CEE
Summary of Contents for CALDARIA CONDENSING 100
Page 38: ...Installation and user manual...