- 35 -
Rotoplat DW 108 - 508
Rotoplat DW-C 108 - 508
14C214026
English
- 35 -
Chapter 4
INFORMATION ON HANDLING AND INSTALLATION OPERATIONS
4.5.
FASTENING THE MACHINE
– When you have finished
assembling the units and checking
the levels, squaring, parallelism,
and orthogonal shape, you must
fasten the machine body onto
the floor.
– Depending on the characteristics
of the flooring, it may be necessary,
before positioning the machine, to
create foundations at the points
of the various support legs.
The creation of the foundations
and the fastening of the machine
are fundamental operations for
ensuring the stability and correct
functioning of the machine.
Important
If necessary, insert metal plates (A)
between the screws and the floor.
4.6.
RECOMMENDATIONS FOR CONNECTIONS
Important
Connections should be performed following the manufacturer’s
indications in the enclosed diagrams. Personnel authorised to
perform this operation must possess technical skills, abilities
and have acquired certified experience in the specific field and
must perform connections professionally, taking into account all
the regulative and legislative requirements. When connections
are completed, make sure these requisites were observed by
performing a general inspection before making the unit operative.