10. Maintenance
10.1 Maintenance Schedule
Perform maintenance work according to the schedule below.
The schedule is set assuming eight hours of operation a day. When the operation time is long such as
24-hour operation, shorten the maintenance intervals as needed.
Visual
inspection
Grease
supply
Start of operation
{
{
*
After 1 month of operation
{
{
Every 1 month thereafter
{
{
* Grease may be consumed more quickly in an environment where the actuator is exposed to steam and
warm water. In this case, it is recommended that you add grease before the scheduled timings.
10.2 Visual Inspection
Visually check the items specified below.
Actuator body
Loosening of body mounting bolts, etc.
Slider rod
Lubricating condition of food-grade grease, scratches on pipe
surface, deformation
Guide rod
Scratches on pipe surface, deformation
Supplied cable
Scratches, coupling condition of connector
General Abnormal
noise,
vibration