SECTION 10: C
OMMISSIONING
41 of 85
10.1.1 Louvers
Where fitted, the air deli
v
ery lo
uv
ers need to be set
d
u
ring commissioning to gi
v
e the req
u
ired air
distrib
u
tion.
10.1.2 Electrical Checks
All pre-commission checks m
u
st be carried o
u
t
before commissioning the heater.
1. Check that all site
w
iring is connected in
accordance
w
ith the appropriate
w
iring dia-
grams sho
w
n
on Page 28, Section 9.3
through
Page 39, Section 9.14
.
2. Check the correct f
u
se size is fitted in the local
s
u
pply isolator.
See Page 11, Section 4.4
.
10.1.3 Polarity Test - 1 Ø
10.1.4 Polarity Test - 3 Ø
Voltage bet
w
een each phase L1, L2 and L3 and
Earth or Ne
u
tral sho
u
ld be approximately 230 V.
Voltage bet
w
een any 2 phases sho
u
ld be
approximately 400 V. Test Ne
u
tral to Earth as single
phase.
10.1.5 Fan Rotation Check
S
w
itch on the electricity s
u
pply at the isolator and
the man
u
al s
w
itch to "fan on" (if no remote fan s
w
itch
is installed, press the
w
hite b
u
tton on the fan/limit
thermostat). On 3 Ø heaters, check the rotation of
the main fan. Rotation sho
u
ld be in the direction of
the arro
w
sho
w
n on the fan ho
u
sing. If rotation is not
correct, t
u
rn off the isolator and change o
v
er any
t
w
o of the incoming s
u
pply phases and recheck. It
w
ill be necessary to remo
v
e the lo
w
er front or right
side panel to see fan rotation.
10.1.6 Fan Motor Overload Check
On 3 Ø belt dri
v
e heaters, check the correct settings
of the fan motor o
v
erload. This sho
u
ld be 0.2 A
abo
v
e the rated c
u
rrent on the heater data plate.
See Page 11, Figure 4.4
. The belt tension and
alignment sho
u
ld also be checked and adj
u
sted as
sho
w
n
on Page 52, Figure 23
.
10.1.7 Mechanical Checks
1. Check that the fl
u
e is installed in accordance
w
ith these instr
u
ctions and local reg
u
lations.
2. Check that the settings of the Combination Fan/
Limit thermostat are correct -
See Page 41,
Figure 17
.
Fi
g
ure 17: Combination Thermostat (all models)
10.1.
8
Burner (
g
as heaters)
T
w
o-stage (High/Lo
w
) b
u
rners ha
v
e additional
specific req
u
irements. Follo
w
the man
u
fact
u
rer's
instr
u
ctions, the data pro
v
ided
on Page 11, Section
4.4
through Page 13, Section 4.7
, and the
commissioning instr
u
ctions on
See Page 43,
Section 10.3
.
10.1.9 Gas Supply
All aspects of the gas installation, incl
u
ding the gas
meter, m
u
st be inspected, tested for so
u
ndness and
p
u
rged in accordance
w
ith local and national codes.
Ens
u
re that the air is f
u
lly p
u
rged from the heater
inlet pipe
u
p to the main gas
v
al
v
e inlet test nipple.
Adj
u
st the press
u
re s
w
itch located on the D
u
ngs gas
v
al
v
e to 50% of its minim
u
m inlet
w
orking press
u
re.
10.1.10 Before Operatin
g
the Heater
Ens
u
re the b
u
rner head, air damper and press
u
re
s
w
itch settings are adj
u
sted for the correct b
u
rner in
accordance
w
ith the Data Tables
on Page 11,
Section 4.4
through Page 14, Section 4.8
(see the
b
u
rner reference letter on data plate).
To ens
u
re that all the controls are in safe
w
orking
order, operate the heater for the first time
w
ith the
isolating gas
v
al
v
e t
u
rned off.
1. T
u
rn off the gas isolating
v
al
v
e
2. Using the installed external control, t
u
rn on the
b
u
rner. The a
u
tomatic seq
u
ence
w
ill no
w
begin
as described
on Page 43, Figure 18
.
There
w
ill be no ignition of the b
u
rner and locko
u
t
w
ill occ
u
r,
w
hich pro
v
es the controls are operating
correctly.
10.2 Commissionin
g
the Sin
g
le Sta
g
e Burner
(
g
as heaters)
Follo
w
the man
u
fact
u
rer's instr
u
ctions and the data
pro
v
ided
on Page 11, Section 4.4
through Page 14,
Section 4.8
.
L
N
Less Than
0.1 ohm
ohm
V
230v 50Hz AC
V
0v
(must be less than 15v)
Supply
Earth
Terminal
C°
20
40
60
80
100
120
Set Point 1
Fan Off
Set to 38°C
Set Point 3
Limit
Set to 110°C
Set Point 2
Fan On
Set to 60-65°C
Summary of Contents for Combat MGB0100