![Roberts Gorden Combat MGB0100 Installation Manual Download Page 29](http://html.mh-extra.com/html/roberts-gorden/combat-mgb0100/combat-mgb0100_installation-manual_1469669029.webp)
SECTION
8
: F
UEL
P
IPE
W
ORK
23 of 85
SECTION
8
: FUEL PIPE WORK
It is important that the gas s
u
pply pipe and the
electrical connections do not s
u
pport any of the
heater’s
w
eight.
A gas meter is connected to the ser
v
ice pipe by the
Gas S
u
pply Company. Any existing meter sho
u
ld be
checked, preferably by the company, to ens
u
re that
the meter is adeq
u
ate for the rate of gas s
u
pply
req
u
ired.
Installation pipes m
u
st be fitted in accordance
w
ith
local and national codes. Pipe
w
ork from the meter
to the heater(s) m
u
st be of adeq
u
ate size.
8
.1 Connections
Connect the heater to the gas s
u
pply, ens
u
ring that
the final connections are as follo
w
s:
• Gas s
u
pply pipe is r
u
n in medi
u
m or hea
v
y
ga
u
ge t
u
bing in compliance
w
ith local and
national codes.
• The gas s
u
pply pipe is adeq
u
ately sized to carry
the total
v
ol
u
me of gas for the complete
installation.
• An isolating
v
al
v
e and
u
nion connection sho
u
ld
be
u
sed and fitted into the s
u
pply adjacent to the
heater.
IMPORTANT - The complete installation m
u
st be
p
u
rged and tested for gas so
u
ndness in accordance
w
ith local and national codes.
• Check the pipe and tubin
g
ends for leaks
before placin
g
heatin
g
e
q
uipment into
service. When checkin
g
for
g
as leaks, use a
approved leak detection fluid; never use an
open flame.
WARNING
Explosion Hazard
Leak test all components of gas pipe work
before operation.
Gas can leak if pipe work is not installed
properly.
Do not high pressure test gas pipe work with
heater connected.
Failure to follow these instructions can result
in death, injury or property damage.
Summary of Contents for Combat MGB0100
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...1 of 85 Product Approval ...
Page 91: ...SECTION 16 SPARE PARTS LIST 85 of 85 ...
Page 92: ......