Installation
20
Operating Instructions for the TERZ 94 Electronic Turbine Meter
Installing the remote totalizing unit
If your TERZ 94 is designed for remote totalizing, you can install the totalizing
unit at a distance of up to 50 m from the meter case. Usually, the cable has
already been connected to the sensor and the totalizing unit when the
TERZ 94 is delivered. Should this not be the case, you will have to connect
the connecting cable to Input-terminal X5, clamp 3 (+) and clamp 4 (-) of the
display board and the terminals marked “Zählwerk / Index Input“ on the
terminal head. Use only shielded cables of the type:
LIYCY - 2 x 0.75 blue
Maximum cable length: 50 m
Connect the wires of the sensor to the terminals marked ““ and
“Sensor -“ of the terminal head (make sure that the polarity is correct!).
Furthermore, you must check the plug-in jumpers XS1, XS2 and XTERZ90 on
the display board.
Settings at XS1 and XS2: jumpers 3-4
Summary of Contents for TERZ 94
Page 2: ......
Page 11: ...Safety Instructions Operating Instructions for the TERZ 94 Electronic Turbine Meter 9...
Page 21: ...Installation Operating Instructions for the TERZ 94 Electronic Turbine Meter 19...
Page 23: ...Installation Operating Instructions for the TERZ 94 Electronic Turbine Meter 21...
Page 35: ...Operation Operating Instructions for the TERZ 94 Electronic Turbine Meter 33 3 Test protocol...
Page 62: ...Annex 60 Operating Instructions for the TERZ 94 Electronic Turbine Meter mode are blanked out...