7. Working life
49
De
utsch
English
Fr
a
n
ca
is
Espanol
Italiano
7.7.2 Performing an initialisation run
The initialisation run can be performed as follows with any hand switch if error E000,
E010 or E021 is present:
Error messages will only be indicated on the 6-key hand switch!
•
Ensure that all drives and controllers are interconnected and that the mains plug is
not
con-
nected. If you have pulled out the mains plug to perform an initialisation run, wait for at least
30 seconds before plugging it back in.
•
Keep the DOWN key
on the hand switch pressed.
•
Plug the mains plug in and wait for about 5 seconds.
Note: The software release (e.g. "
0217
"), the type of lifting column connected (e.g. "
-20-
")
and "[In d]" appears in hand switches with display.
•
Release the DOWN key
.
•
Press the DOWN key
again and keep it pressed until all drives have moved to the lower
end stop.
Note: When the lower end stop is reached, "
[In U]
" appears in the display.
•
Press the UP key
and keep it pressed until all lifting columns have moved to the upper end
stop.
Should it be impossible to reach the top end stop, the initialisation run can be ended in any po-
sition by keeping the DOWN key
pressed for 5 seconds. The position is the new end stop for
the drives.
The initialisation run is complete. The controller is now ready for operation. The operation of the
2-key or 6-key hand switch is described in sections 7.11 and 7.12.