- Building Codes and Regulations 31.01.04 “Acceptance into operation of completed construction 

objects”; 

-  GOST  27303  “Steam  and  hot  water  boilers.  Rules  of  acceptance  into  operation  after 

installation”; 

- Standard instruction for boiler plant personnel; 
- Fire Safety Rules 01 “Fire Safety Rules in the Russian Federation”. 

 

6.1. Boiler installation 

6.1.1.  The  boiler  is  installed  on  a  reinforced  concrete  foundation,  made  at  the  same  time  with  the  floor. 

When installing a boiler module, a common frame or foundation is installed on which the supports (22) of the 
boilers are mounted. 

6.1.2. The supports (22) are installed on the foundation so that the distance from the back wall of the ashpit 

to the wall of the boiler plant is at least 0.9 m, and its door is located conveniently for maintenance and does 
not  touch  the  foundation. The support is  connected  to  the  foundation  rigidly  on  the  anchor  bolts  in  order  to 
avoid displacements during the assembly and disassembly of the boiler (heat exchanger) during its cleaning, 
repair, and technical inspection. The arms (17) of the grate (20) must be secured with a clamp lock (15) in a 
vertical position. 

6.1.3. The heat exchanger is installed on the exposed ashpit in the center of the ashpit seat. In order to avoid 

air leaks, the junction of the heat exchanger and the ashpit is sealed with fireproof fiber material. 

6.1.4. When installing the heat exchanger, the boiler 

gas flue pipe

 should be directed towards the wall of 

the boiler plant (when installing one boiler) or towards the gas collector (when installing several boilers). 

6.1.5.  Between  the  boilers,  loading  scaffolds  with  ladders  are  rigidly  placed  on  the  foundation.  When 

installing one boiler or installing a scaffold to the side of the last boiler, it is necessary to install a railing for 
the scaffold and the ladder. 

6.1.6. Valves (ball valves, shutters, etc.) are mounted on the supply and return pipes of the boiler, through 

which the boiler is connected to the heating system. When several boilers are installed inside one boiler plant, 
the  boilers  are  connected  to  the  heating  system  through  a  supply  and  return  manifold,  mounted  between the 
boilers and the wall of the boiler plant. 

 

6.2. Chimney installation 

6.2.1.  A  vertical  chimney  with  a  manhole  for  cleaning  the  pipe  (if  necessary)  is  mounted,  as  a  rule, 

between the boiler and the wall of the boiler plant. The required chimney draft is 39 Pa. The chimney is made 
of sheet steel with a minimum thickness of 2 mm. The diameter of the boiler chimney depends on the power of 
the  boiler,  its  height,  but  cannot  be  less  than  the  diameter  of  the  boiler  flue  pipe.  The  height  of  the  pipe  is 
determined by calculation, and its minimum height cannot be less than 6 m and must be higher than the ridge 
of the building of the boiler plant or the building adjacent to the boiler room, not less than 1 meter. The pipe 
must be insulated. The pipe must be heated to eliminate condensate in the pipe. 

6.2.2. When two or three boilers are connected with one chimney, the diameter and length of the latter is 

determined by calculation, and in places where chimneys are installed, the combining gas collector must have 
a cross-sectional area 1.2-1.5 times larger than the total cross-sectional area of the chimneys inserted into it. 

 6.2.3. The boiler flue pipe is cut into the chimney at an angle of no more than 45 degrees (relative to the 

axis of the chimney). At the same time, it is not allowed to reduce  the diameter of the gas flue being cut in 
compared with the gas flue of the boiler. If necessary, the boiler flue may  be cut into the chimney through a 
special  angular  flange  insert.  With  this  insertion,  the  flue  of  the  boiler  is  disconnected  from  the  chimney  in 
case of the heat exchanger dismantling (the boiler dismantling or repair). 

6.2.4. The chimney is assembled at a zero mark on a specially laid platform by the site level. All the joints 

are welded, then with the help of a lifting mechanism the pipe is lifted vertically and securely fastened to the 
wall of the building. In the absence of a wall or for other reasons, the pipe can be mounted on stretches made 
of wire (rod) with a diameter of at least 8 mm. 

 

Summary of Contents for UNIVERSAL RG Series

Page 1: ...assport data and the boiler you have purchased which do not affect its technical characteristics and consumer properties When purchasing a boiler check the completeness appearance of the product and t...

Page 2: ...ek ee The warranty period of the boiler manufactured in accordance with EN 303 5 2012 GOST 20548 TC 4931 007 82749029 2007 is 24 months from the date of sale via a retail network The warranty period f...

Page 3: ...E 8 6 4 HEATING SYSTEM INSTALLATION 8 6 5 THE BOILER IGNITION PROCEDURE 8 6 6 BOILER SHUTDOWN PROCEDURE 9 6 7 BOILER OPERATION 9 7 SYSTEM TESTING SAFETY DEVICES 10 8 SAFETY RULES FOR INSTALLATION MAIN...

Page 4: ...etc 1 7 As a rule the boiler is installed directly in the vicinity of the heated facility or directly on the facility when a height of the boiler plant is at least 2 8 m When installing the boiler ou...

Page 5: ...layer which virtually eliminates the formation of carbon monoxide and provides the boiler with efficiency of up to 84 when operating in optimal mode 4 6 The average seasonal fuel consumption calorific...

Page 6: ...ried out on the operating boiler by shaking grates 20 fixed on rotating shafts using two arms 17 located on the front part of the ashpit Ash and unburned particles of coal pour down into the ashpit 20...

Page 7: ...several boilers are installed inside one boiler plant the boilers are connected to the heating system through a supply and return manifold mounted between the boilers and the wall of the boiler plant...

Page 8: ...recommended to fill the system with soft water that does not contain salts and other impurities which being deposited on the walls of pipes and jacket of the boiler impair heat transfer and their effi...

Page 9: ...uid or circulation along a small or one of the heating system circuits due to its unregulated or obstructed pipes etc 6 6 3 Emergency shutdown of the boiler is performed as follows Tightly close the a...

Page 10: ...ashpit junction with the heat exchanger are carefully sealed with fireproof gaskets and cords 6 7 10 The boiler s construction allows its cleaning from rocks and large pieces of ash as they accumulat...

Page 11: ...3 The boiler is fireproof The temperature of its outer surfaces does not exceed the normalized values but during its operation the gas flue pipes and chimney are heated to a high temperature In order...

Page 12: ...y walls the presence of foreign objects in the chimney very fine coal dust coal is used low quality fuel is used a large amount of ash on the grates or in the ashpit fuel stall in the bunker Clean the...

Page 13: ...pacity It is recommended to carry out preventive cleaning of the boiler heat exchanger every 2 months 11 4 The heat exchanger cleaning is done by pulling the upper removable part of the bunker 13 by i...

Page 14: ...of steam and hot water boilers with a steam pressure of no more than 3 kgf cm2 hot water boilers water heaters with water heating temperature not higher than 75 EN 303 5 2012 GOST 20548 TC 4931 007 8...

Page 15: ...echnical operation Date The result of the examination Date of the next examination Signature of the person responsible 6 1 Registration The UNIVERSAL RG boiler______________________ water heating is r...

Page 16: ...e boiler into operation Repeated call in a specialist is paid by the buyer Terms of warranty validity Acceptance of the boiler into operation should be carried out only with the participation of an au...

Page 17: ...a i ja ekspluateerimisreeglite rikkumine v ib ajendada tarbimisomaduste alandust v i t rge ja sama garanteerimisremonti iguse kaotamine Tehas tegija sama teeb t iendava seadmete hange mis pole l litat...

Page 18: ...kuud ekspluatatsioonip eva sisse l litamiseks vaid mitte rohkem kui 24 kuud m gip evast Palume Teid j rgida alltoodud n udmisi ja k igepealt igaaastase kontrolli l biviimist ja spetsialiseeritud orga...

Page 19: ...P LETAMISE KORD 8 6 5 KATLI PEATAMISE KORD 8 6 6 KATLI EKSPLUATEERIMINE 9 7 S STEEMI KATSED KAITSEVAHENDEID 9 8 MONTAA I TEENINDAMISE JA EKSPLUATEERIMISE OHUTUSREEGLID 10 9 KATLI T KORRASTUSED JA NEND...

Page 20: ...liruumise k rgel mitte v hem kui 2 8 m Katli installeerimine soojustatud ruumi v ljaspool katli soojusisoleerimine ja sama k ikide torustiku igustamata soojukaotamise ja kiire s steemi mberk lmetamise...

Page 21: ...ub ruumide soojustusest 5 Koostis ja t p him tted Katli skeem on toodud Joones 1 1 Tuhakasti uks 12 Bunkri alamosa mahav tmise k epidemed 2 huservi regulaator 13 lem mahav tmise bunkri osa 3 P letamis...

Page 22: ...EN 303 5 2012 k esoleva juhend ja katli pass 3 kgs ruutsm veesoojuskatlite ja veesoojuste mis veetemperatuur mitte k rgem kui 85C seadme reeglid Kuuma vee ja auru torustiku ohutu ekspluatatsiooni sea...

Page 23: ...ti ukse kaudu ilma soojusvahetuste demontaa iga kui ka tuhakasti leval p rast soojusvahetuse demontaa i 6 3 2 Tehas tegijaga katli omanike n udega tehakse remondikomplektede toomine tuharestide vahe t...

Page 24: ...huservi regulaator kinni 2 ja avame alam huetteanne regulaator 4 teeme katsete kaudu l tku veetemperatuur ei pea letama 75 kraadi 6 6 Katli peatamise kord 6 6 1 J rguline katli peatamine toimub 1 p e...

Page 25: ...e huimejate eemaldamisega gaasiteedel gaasikogus ja suitsuk ijal suitsutorul j tkukoha kvaliteetse keevitamise arvelt Imimese v ltimiseks suitsuteede puhastamisluuk gaasitee risisestus konomaaiser ja...

Page 26: ...ise leva k va taldatega jalatsitega 8 5 N op letuse v ltimiseks on keelatud katli katust v lja v tta levaade v i k tuse bunkrisse allalaadimise tuhakasti avatud uksega 8 6 On keelatud kasutada p letav...

Page 27: ...s tekkib tahmi ja t rvu mis alandab soojusvahetust ja tema j udsus Soovitatakse ks kord 2 kuu p rast teha profilakteerimis katlipuhastust soojusvahendus 11 4 Soojusvahenduse puhastamine toimub lema pu...

Page 28: ...haseline ___________ on tehtud vastavalt n udmisele Seadme reeglid ja ohutu auru ja veesojendamise aurur huga mitte rohkem kui 3 kgs cm2 veesoojendamiskatlid veesojendajad veesojenda temperatuuri mitt...

Page 29: ...kontrolli mise kuup eav Allkiri 5 2 Tehnilise ekspluatatsiooni ja korraliku seisundi vastutav isik Kuup ev Tunnustamise tulemus J rgmise tunnustamise kuup ev Vastutava isiku allkiri 6 1 Registreerumi...

Page 30: ...se eest maksab ostja Garantiikohustuse kehtestumise tingimused Katli ekspluatatsioonisse v tmine peab olema tehtud ainult vastava spetsialisti osalemisega Katli ekspluateerimisel on kohustuslik igaaas...

Page 31: ...UNIVERSAL RG EN 303 5 2012 4931 007 82749029 2007 4931 008 82749029 2007 www Ritek ee...

Page 32: ...2 EN 303 5 2012 20548 4931 007 82749029 2007 24 EN 303 5 2012 30735 2001 4931 008 82749029 2007 18 24...

Page 33: ...3 1 4 2 4 4 5 5 5 6 6 6 1 6 6 2 7 6 3 7 6 4 8 6 5 9 6 6 9 7 10 8 11 9 11 10 12 11 13 12 14...

Page 34: ...1 UNIVERSAL RG EN 303 5 2012 4931 007 82749029 2007 4931 008 82749029 2007 1 2 2 4 80 1 3 1 4 1 5 1 6 1 7 2 8 1 8 1 9 0 7 1 10 UNIVERSAL RG 1000 2 2 1 UNIVERSAL RG 3 3 1 1 1 1 1 1 1 4 4 1 750 650 750...

Page 35: ...3 4 4 4 5 84 4 6 6000 70 80 1 200 1 10 30 4 7 c 40 8 24 36 5 1 1 12 2 13 3 14 4 15 5 16 6 17 7 18 8 19 9 20 10 21 11 22 23 24 25 900 3 250 400 750 930 900 2040 57 200 40 132 0 01 13 18 19 20 21 22 23...

Page 36: ...4 1 14 18 21 20 5 4 2 13 9 23 19 24 25 21 20 1 23 2 2 4 5 4 16 20 17 20 3 5 5 9 6 UNIVERSAL RG 10 574 03 18 06 2003 EN 303 5 2012 3 2 85 3 05 05 3 01 01 217 31 01 04 27303 01 6 1 6 1 1 22 6 1 2 22 0...

Page 37: ...7 17 20 15 6 1 3 6 1 4 6 1 5 6 1 6 6 2 6 2 1 39 Pa 2 6 1 6 2 2 1 2 1 5 6 2 3 45 6 2 4 8 6 3 6 3 1 20 6 3 2 2 2 6 4 6 4 1 6 4 2 0 5 1 1...

Page 38: ...8 10 6 4 3 6 3 4 6 4 5 6 5 6 5 1 6 5 2 6 5 3 6 5 4 4 5 20 6 5 5 20 2 50 70 6 5 6 6 5 7 6 5 8 6 5 9 15 30 15 5 6 5 10 30 6 5 11 2 6 5 12 600 6 5 13 2 4 75...

Page 39: ...9 6 6 6 6 1 1 6 6 2 850 6 6 3 2 4 90 6 6 4 6 7 6 7 1 UNIVERSAL RG 6 7 2 2 3 10 15 2 6 7 3 13 9 2 4 40 6 7 4 1 8 6 7 5 1 6 7 6 750 60 6 7 7 100 200 20 6 7 8 6 7 9...

Page 40: ...10 6 7 10 6 7 11 6 7 12 7 7 1 100 10 2 UNIVERSAL RG 3 2 7 2 7 3 7 4 7 5 3 2 850 7 6 7 7...

Page 41: ...11 8 8 1 8 2 8 3 8 4 8 5 8 6 8 7 10 10 8 8 8 9 0 1 8 10 8 11 8 12 8 13 8 14 34 03 301 87 139 87 9 95 20...

Page 42: ...12 10 10 1 10 2 10 1 10 3 11 11 1 11 2 11 3 2 11 4 13 11 5 11 6 11 7...

Page 43: ...______________________________ _________________132___________________ 2 1 Universal RG ___________ 3 2 750 EN 303 5 2012 20548 4931 007 82749029 2007 30735 2001 4931 008 82749029 2007 ______ ________...

Page 44: ...14 3 4 3 3 5 4 1 5 1 5 2 6 1 UNIVERSAL RG _____ ____________________201____ ____________ ___________________ __________ _____________ ____________________________________ __________________...

Page 45: ...15 EN 303 5 2012 20548 4931 007 82749029 2007 24 100 ___________________20___...

Reviews: