7
Specification of 16i
Type of Appliance
Temp Controlled Continuous Flow Gas Water Heater
Operation
With / Without remotes (Kitchen, Bathroom, etc.)
Flue System
Room Sealed, Forced Draught Flue
Installation
Internally Mounted only
Available Temps
37C - 48C (1 deg Increments) 50, 55, 60
Width 370
mm
Dimensions Height
675
mm
Depth
130 + 45 mm
Weight
15
kg
Gas
1/2 in bsp
Connections
Cold Water
1/2 in bsp
Hot Water
1/2 in bsp
Ignition System
Direct Electronic Ignition
Noise Level
49 dB(A)
Nox
55 ppm Max
Water Temp Control
Simulation feed forward and feedback
Flame Failure
Flame Rod
Boil Dry
Water Flow Sensor
Remaining Flame
97 C bimetal switch
Safety Devices
Over current
Glass Fuse 3 Amp
Over pressure
Pressure Relief Valve 15 bar open, 12 bar close
Combustion Fan
Integrated circuit system
Fusible Link
150 C Thermal Fuse
Over temperature
Lockout Thermistor 95 C
Heater Mounted
MC-45-SR-EU
Remote Controls
Kitchen
BC-45-SR-EU or BSC-45-SR-EU
Bathroom BC-45-SR-EU or BSC-45-SR-EU
Remote Cable
Two core sheathed (double insulated) flex with min 0.55 mm
2
G20 Nat Gas Press Low
1.8 mbar
G20 Nat Gas Press High
9.0 mbar
G25 Nat Gas Press Low
1.8 mbar
G25 Nat Gas Press High
9.0 mbar
G30 LPG (Butane) Press Low
2.2 mbar
G30 LPG (Butane) Press High
11.4 mbar
G31 LPG (Propane) Press Low
2.2 mbar
G31 LPG Propane) Press High
14.2 mbar
Gas Consumption Low (Gross)
G20 Nat Gas
4.7 kW
0.4 m3/hr
G25 Nat Gas
4.0 kW
0.4 m3/hr
G30 LPG (Butane)
4.9 kW
0.35 kg/hr
G31 LPG (Propane)
4.9 kW
0.35 kg/hr
Gas Consumption High (Gross)
G20 Nat Gas
34.9 kW
3.26 m3/hr
G25 Nat Gas
29.6 kW
3.26 m3/hr
G30 LPG (Butane)
36.8 kW
2.6 kg/hr
G31 LPG (Propane)
36.5 kW
2.6 kg/hr
Max Flow raised 25C
15.2 L/min
Min Operation Flow
2.4* L/min
Water Pressure Nom.
1.1 - 7.0 bar
Power Supply
230 V / 50 Hz
Electric Consumption
68 Watts
Summary of Contents for FUA-E
Page 1: ......
Page 5: ...5 Glossary of Terms and Symbols ...
Page 9: ...9 Dimensions ...
Page 11: ...11 Structure Diagram ...
Page 17: ...17 Gas Conversion Procedure ...
Page 18: ...18 Gas Conversion Procedure ...
Page 25: ...25 Operational Flow Chart ...
Page 26: ...26 Time Charts ...
Page 39: ...39 Diagnostic Checks Fault Finding Chart ...
Page 40: ...40 Fault Finding Chart ...
Page 41: ...41 Fault Finding Chart ...
Page 42: ...42 Fault Finding Chart ...
Page 43: ...43 Fault Finding Chart ...
Page 44: ...44 Fault Finding Chart ...
Page 45: ...45 Fault Finding Chart ...
Page 46: ...46 Wiring Diagram ...
Page 49: ...49 Dismantling for Service ...
Page 50: ...50 Dismantling for Service ...
Page 51: ...51 Dismantling for Service ...
Page 52: ...52 Dismantling for Service ...
Page 53: ...53 Dismantling for Service ...
Page 54: ...54 Dismantling for Service ...
Page 55: ...55 Dismantling for Service ...
Page 56: ...56 Exploded Diagram ...
Page 57: ...57 Exploded Diagram ...
Page 58: ...58 Exploded Diagram ...
Page 59: ...59 Exploded Diagram ...
Page 60: ...60 Exploded Diagram ...
Page 61: ...61 Parts List ...
Page 62: ...62 Parts List ...
Page 63: ...63 Parts List ...
Page 64: ...64 Parts List ...
Page 65: ...65 Letter of Compliance ...
Page 66: ...66 CE Certificate ...
Page 67: ......