58
Prepare for Operation
1. If needed remove the
toe kick plate to fill
the humidifier tray.
2. Fill the humidifier
tray according to the
installation manual.
Replace toe kick
plate.
1. To direct air flow, if
needed, the front
louvers can be
adjusted after
removing louver
plate (5 screws).
2. Install the filter.
3. Open all gas valves.
4. Turn unit on and set
temperature.
5. Educate consumer
on use and care.
5 screws secure
louver plate
Vertical louvers can be gently turned to
direct air flow
Summary of Contents for Energysaver ES38
Page 1: ...Rinnai ENERGYSAVER Direct Vent Wall Furnace Installation Fundamentals ...
Page 30: ...30 View of Properly Installed Unit ...
Page 50: ...50 Vent Termination OUTSIDE VIEW OF CORRECTLY INSTALLED TERMINATION ...
Page 60: ...60 Extended Venting And High Altitude Installation Procedures ...
Page 74: ...74 Decorative Covers For Vent Extension Kits ...