44
Vent Termination
VENT TERMINAL PREPARATION
• The flue manifold (vent) must exhaust to the outside. Do not exhaust into other rooms.
• The flue is not designed to be positioned under floors or below the furnace.
• Clearance to combustibles for the vent sleeve and flanges is zero inches.
• This appliance can only be used with one of the five types of Rinnai vent kits. These kits and
their dimensions are listed below and in each owner’s/installation manual.
NAME
KIT NUMBER
KIT WALL DIMENSIONS
S Vent Kit
FOT-150
3”-4 ½” (75 – 115 mm)
*A Vent Kit
FOT-151
4 ½”-9 ½” (115 – 240 mm)
B Vent Kit
FOT-152
9 ½”-15 ¾“ (240 – 400 mm)
C Vent Kit
FOT-153
15 ¾ -
23 5/8“ (400 – 600 mm)
D Vent Kit
FOT-154
23 5/8”-31 ½” (600 – 800 mm)
*Vent Kit A (FOT-151) is
included with each furnace
Summary of Contents for Energysaver ES38
Page 1: ...Rinnai ENERGYSAVER Direct Vent Wall Furnace Installation Fundamentals ...
Page 30: ...30 View of Properly Installed Unit ...
Page 50: ...50 Vent Termination OUTSIDE VIEW OF CORRECTLY INSTALLED TERMINATION ...
Page 60: ...60 Extended Venting And High Altitude Installation Procedures ...
Page 74: ...74 Decorative Covers For Vent Extension Kits ...