Installation & Servicing Instructions Rinnai E-Series
93
Boiler
basic
piping
fi
g. 5
1.
shut off valve
2.
system circulator
3.
check valve
4.
balancing valve
5.
boiler drain valve
6.
dirt trap
7.
air separator
8.
automatic fi ll valve
9.
back fl ow preventer
10. expansion tank
11. bypass for system cleaning
T
P
Low Loss Header
V1
Service valve
V2
Service valve
1
2
3
4
5
6
7
8
9
11
10
Plumbing
Kit
installation
fi
g. 6
1
2
3
4
5
6
7
1. Plumbing kit
2. Safety valve
3. Drain and Purge connection
4. Bronze adapter
fi
ttings
5. Service valves*
6. Flow 1 1/4"
7. Return 1 1/4"
8. Pressure gauge*
8
Compression fittings.
Parts:
1.
Nut
2.
Ferrule
3.
Fitting
Fitting instructions:
Clean pipe ends tho-
roughly. The outside
sur face has to be
smooth before fitting.
1. Push the complete
fitting over the pipe as
far as possible. Ferrule
should be over the
pipe completely.
2. Turn the nut handtight
clockwise.
3. Use 2 wrenches, one
to hold the fitting on
its place, the other
for tighten the nut
clockwise in 3/4 turn.
2
1
3
!
WARNING
NOTICE
i
NOTICE
i
Do not overtighten these fi ttings when
connecting fl ow and return pipe to the
plumbing kit. Max. 150Nm / 100 foot-
pounds (ft lb) / 1327 inch-pounds (in lb). Failure to follow these
instructions may result in leakage causing property damage
and would not be covered under warranty.
* After installation of the plumbing kit to the
boiler the pressure gauge and both handles
of the service valves must be mounted. Be
sure the gauge is fi tted leak free and that the handles are secured
with the supplied nuts.