Installation & Servicing Instructions Rinnai E-Series
9
4
Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
•
Please check if the packaging is intact.
•
Check if all the items listed are included in the delivery.
The supply kit contents:
Description
Amount
E50CRN
E75CRN
E75CRP
E110CRN
E110CRP
Part No. Fitting Kit complete:
804000088
804000046
804000047
Boiler with:
Outdoor reset sensor
1
1
1
22mm compression fi tting ring
4
4
4
Nut W1.1/8x1/14 22 Compression fi tting
2
2
2
Adapter fi tting 22mm x 1"NPT ext.
2
2
2
Screw 4,8X16mm
4
4
4
Line voltage input connector 3 pole grey
1
1
1
Cap de-aerator
1
1
1
Water lock 1/2"NPT ext.x1/4"NPT int.
1
1
1
Mano-/thermometer 1/4"NPT 64
1
1
1
Safety valve 4 bar 3/4"NPT ext.
1
1
1
Flow restrictor FG 3.2 GPM brown
1
1
Flow restrictor FG 4.6 GPM green
1
15mm compression fi tting ring
4
4
4
Adapter fi tting 15mm x 3/4"NPT ext.
2
2
2
Nut 15mm compression fi tting
2
2
2
Concentric fl ue adapter Ø80/125mm
1
Plug fl ue gas
2
Gasket air supply Ø120
1
Cover air supply Ø80
1
Gasket vent system/air supply
1
Feed t plug fl ue gas
1
1
Flue adapter 3" pps UL appr.
1
1
Air supply adapter 3" pps UL appr.
1
1
Lip-ring fl ue pipe ø80
1
1
Wall mounting bracket HEX1/2S
1
1
1
Template
1
1
1
Installation & Service Instructions
1
1
1
User information manual
1
1
1
Warranty document
1
1
1
ICSL book
1
1
1
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When transporting the boiler must be secured on the transportation equipment to
prevent it from falling off .
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
•
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
!
CAUTION