background image

8

 

1.7 

Installation of the boiler

The boiler must be installed respecting the minimum indicated 

distances to allow the necessary maintenance work to be car-

ried out. The position “A” depends on the burner model used.

A + 400 mm

(min. 900 mm)

A + 400 mm

(min. 900 mm)

600 mm

RTT 29 RTT 39 RTT 49 RTT 59 RTT 69 RTT 79

L (mm)

505

605

705

805

905

1,005

A

800 mm

L - 300 mm

200 mm

L

The recommended height for the boiler room is at least 2,200 

mm, leave the minimum space free on the sides and in front of 

the boiler as shown in the drawing. 

Provide a base for the RTT 59-69-79 boilers with a minimum 

height of 200 mm off the floor for the installation of the burner 

of the boiler. 

Characteristics of the base:

 

− it should be made of BS 25 fibre concrete,

 

− it should respect the indicated dimensions,

 

− it should not be covered with a slippery material like ce-

ramic, etc.

 

− any acoustic insulation should be made before the base.

In the RTT 29-79 boilers, the door of the burner can open on both 

sides. For this reason, equal free distances are specified on both 

sides (min. 700 mm). This characteristic is advantageous for op-

erations to be carried out on the boiler. If the space available 

in the boiler room is not sufficient for the distances indicated, 

you can choose the opening side and leave more space free on 

that part. On the other part, half the indicated free distance is 

sufficient. 

Provide enough space for the tools to be used in the boiler room.

Summary of Contents for RTT 29

Page 1: ...cod Doc 0079317 rev 0 03 2016 RTT 29 79 EN INSTRUCTIONS FOR THE INSTALLER AND FOR THE TECHNICAL ASSISTANCE CENTRE...

Page 2: ...cally capable of carrying out routine maintenance keep it running at maximum efficiency with low running costs and which has original spare parts if required This instruction booklet contains importan...

Page 3: ...Instructions for use 13 1 20 Conveyance and discharge of the boiler water 13 1 21 Instructions for disposing of the product 13 1 22 Fire prevention regulations for the boiler room 14 1 23 Controls and...

Page 4: ...peciallyinsummer whentheboilerisoffforalongperiod to avoid problems of incrustation in the circulation pumps the boiler must be switched on 1 2 times a month and the circulation pumps operated for at...

Page 5: ...er increases The RTT 29 79 boilers are made of EN GJL 200 a special alloy that resists expansion and temperature variations which ensures a long working life Thanks to the vertical structures that hav...

Page 6: ...mm Water input output coupling G 1 1 4 DN Boiler volume gas side 24 20 33 40 42 60 51 80 61 00 70 20 dm3 lt 0 024 0 033 0 043 0 052 0 061 0 070 m2 Combustion chamber volume gas side 16 94 23 38 29 82...

Page 7: ...ER RTT 39 BOILER RTT 49 BOILER RTT 59 BOILER RTT 69 BOILER RTT 79 M mm 540 640 740 840 940 1 010 502 840 L M 1 6 Delivery The RTT 29 79 boilers are mounted on a wood pallet wrapped with Pluriball and...

Page 8: ...for the installation of the burner of the boiler Characteristics of the base it should be made of BS 25 fibre concrete it should respect the indicated dimensions it should not be covered with a slipp...

Page 9: ...ciently adequate conditions for the boiler room the hydraulic pipes and the other com ponents of the system 9 9Follow the instructions of the local gas suppliers 1 9 Hydraulic system Limescale and oth...

Page 10: ...ic diagram system for heating and domestic hot water production 1 11 Instructions for the connection of the fuel tank The dimensions of the fuel tank support structure should be ad equate for the dime...

Page 11: ...come under 0 5 m sec limit 2 m sec in the advised speed 1 13 Standard control panel of the boiler 1 Main ON OFF switch 2 Boiler thermostat from 30 to 90 C 3 Boiler thermometer 4 Safety thermostat with...

Page 12: ...3 41 4 91 6 00 8 63 5 25 7 56 7 53 10 85 10 22 14 72 12 91 18 59 Height of combustion gas pipe liquid fuel m 7 67 18 85 13 49 33 17 11 82 29 06 16 95 41 67 23 00 56 55 29 05 71 43 If the fuel is natu...

Page 13: ...erruption of current other faults or when the pumps are stopped protection pumps etc the burner should switch off The system should do this automatically Carry out the electrical wiring taking into ac...

Page 14: ...cal system All the boiler s gas and water valves should be open 9 9Check all the other connections according to the system s options 1 24 Boiler start up Engage the electrical supply using the master...

Page 15: ...nnection of the sensors Boiler combustion chamber and any formations of soot in the fume passages cleaning after checking Fastening and seal of the boiler door Seals of the boiler fittings Correct ope...

Page 16: ...ation When assembling the burner be careful not to leave any empty space between the front door and the body of the burner All the points of contact should be covered with insulating material to preve...

Page 17: ...EL BURNER BOILER BURNER MODEL CODE BOILER RTT 29 R40 D08 3481701 RTT 39 BOILER R40 D08 3481701 RTT 49 BOILER R40 D08 3481701 RTT 69 BOILER R40 D17 3482601 RTT 79 BOILER R40 D17 3482601 GAS BURNER BOIL...

Page 18: ...sealant wax silicon compounds For the measurements of the connection for the flue gases dis charge system see pag 8 1 34 Transport and storage The manufacturer transports the boiler on a pallet fixin...

Page 19: ...rmation Retailer Mr Address Tel Technical Assistance Centre Mr Address Tel Installer Mr Address Tel Date Intervention Fuel supplier Mr Address Tel Date Qty supplied Date Qty supplied Date Qty supplied...

Page 20: ...go VR Tel 0442630111 Fax 044222378 www riello it As part of the company s ongoing commitment to perfecting its range of products the appearance dimensions technical data equipment and accessories may...

Reviews: