Important instructions for the boiler

 

9

The boiler room should be well lit and the light switches 

should be located outside the room itself.

 

9

Place any gas detection devices at a height conforming to 

regulations in force.

 

9

Do not place devices like the water pump, the contactor, 

etc., in the boiler room.

 

9

Repair or replace as soon as possible any electric locks, ca-

bles, etc., that could cause short-circuits.

 

9

Before carrying out any welding in the boiler room, switch 

off the boiler and stop the flow of flue gases by closing the 

gas valve.

 

9

The boiler room should not contain any explosive, combus-

tible or inflammable material.

 

9

The boiler room air should not contain any explosive, com-

bustible or inflammable gas.

 

9

Children or non-technical persons should not be allowed 

in the boiler room, just the person who is responsible for it. 

Keep a copy of the key for the boiler room in a safe place for 

emergencies.

 

9

It is possible to insulate the boiler room against noise and 

heat, also the position and the orientation of the boiler are 

important for its acoustic insulation.

 

9

Place the fuel tanks in another room surrounded by walls 

and with adequate natural ventilation.

 

9

Arrange for the creation of a diversion of the water supply 

line near the boiler and a drainage system for draining the 

boiler water.

 

9

It is strongly recommended not to install extraction systems, 

air conditioning system or other devices that in the boil-

er room, as a secondary effect, could cause the so-called 

"vacuum effect" and reduce the draught force of the boiler, 

with the main consequence of damaging the burner.

 

9

Make sure that the boiler room receives sufficient air either 

naturally or forced (using an aspirator).

 

9

To ensure the burner and the boiler work efficiently keep the 

boiler room clean and prevent the formation of humidity.

 

9

The boiler room should have the minimum dimensions 

specified.

 

9

Do not store inflammable material inside the room.

 

9

Do not touch the supply pipe fitting or other hot parts of the 

boiler when it is running.

 

9

Do not install the boiler on a rubber mat.

 

9

When using LPG or another liquid fuel, the boiler room, 

the fuel, the system components and the hydraulic pipes 

need to be in conformity with the parameters established 

by European standards and by gas supplying companies. 

The company is not responsible for any faults or problems 

caused by inadequate or insufficiently adequate conditions 

for the boiler room, the hydraulic pipes and the other com-

ponents of the system.

 

9

Follow the instructions of the local gas suppliers.

1.9 

Hydraulic system

Limescale and other chemical substances in the water can so-

lidify producing incrustations. To prevent this happening, equip 

the system with a closed expansion tank. The water that en-

ters the closed expansion tank does not evaporate and is not 

dispersed. In this way the level of water in the system is kept 

constant and it will not be necessary to add fresh water. In ad-

dition, limescale and dust do not form and the system will have 

a longer life.

 

− The water circulating in the system is not to be used for 

washing or drinking.

 

− Do not take water from the system. If the water level is 

low, top it up.

 

− To prevent damage due to limescale or chemical residues, 

put water in the system with the following recommended 

values: pH > 7.2 TH <25 °Fr. Check the water quality, and 

if the quality of the water used does not meet the re-

quired requisites subject the water to suitable corrective 

processes to obtain the required quality.

 

− To prevent the formation of limescale or sediments inside 

the boiler or their passage from the boiler to the hydraulic 

system, equip the system with suitable protections both 

inside and on the outside.

 

− Connect the circulation pump to the boiler water outlet. 

The power of the pump should be suitable for the boiler.

 

− Provide a 4-way mixing valve or a pump on the by-pass 

section activated by a thermostatic control to raise the 

temperature of the water in the return line.

 

− Provide a 3-way motorised valve connecting the supply 

line and the return line of the heating system, to adjust 

the flow rate of the water in the system according to the 

desired performances.

 

− The amount of water in the system should be such that 

there is always water in the boiler. Otherwise the boiler 

could be subject to corrosion. If the boiler is not used in 

winter, in order to prevent damage from freezing, use an 

anti-freeze product, periodically measure the amount of 

water in the boiler with a pressure gauge if it has a closed 

expansion tank or with a water gauge if it has an open 

expansion tank.

REFERENCE VALUES

pH

less than 7.2

Electrical conductivity

less than 200 μs/cm (25°C)

Chloride ions

less than 50 ppm

Sulphuric acid ions

less than 50 ppm

Total iron

less than 0.3 ppm

M alkalinity

less than 50 ppm

Total hardness

less than 25° F

Sulphur ions

none

Ammonia ions

none

Silicon ions

less than 30 ppm

The Thermostat (1) should be installed at a distance of 3-5 diam-

eters from the connection point to the return line.

D

1

3÷5 

D

Summary of Contents for RTT 29

Page 1: ...cod Doc 0079317 rev 0 03 2016 RTT 29 79 EN INSTRUCTIONS FOR THE INSTALLER AND FOR THE TECHNICAL ASSISTANCE CENTRE...

Page 2: ...cally capable of carrying out routine maintenance keep it running at maximum efficiency with low running costs and which has original spare parts if required This instruction booklet contains importan...

Page 3: ...Instructions for use 13 1 20 Conveyance and discharge of the boiler water 13 1 21 Instructions for disposing of the product 13 1 22 Fire prevention regulations for the boiler room 14 1 23 Controls and...

Page 4: ...peciallyinsummer whentheboilerisoffforalongperiod to avoid problems of incrustation in the circulation pumps the boiler must be switched on 1 2 times a month and the circulation pumps operated for at...

Page 5: ...er increases The RTT 29 79 boilers are made of EN GJL 200 a special alloy that resists expansion and temperature variations which ensures a long working life Thanks to the vertical structures that hav...

Page 6: ...mm Water input output coupling G 1 1 4 DN Boiler volume gas side 24 20 33 40 42 60 51 80 61 00 70 20 dm3 lt 0 024 0 033 0 043 0 052 0 061 0 070 m2 Combustion chamber volume gas side 16 94 23 38 29 82...

Page 7: ...ER RTT 39 BOILER RTT 49 BOILER RTT 59 BOILER RTT 69 BOILER RTT 79 M mm 540 640 740 840 940 1 010 502 840 L M 1 6 Delivery The RTT 29 79 boilers are mounted on a wood pallet wrapped with Pluriball and...

Page 8: ...for the installation of the burner of the boiler Characteristics of the base it should be made of BS 25 fibre concrete it should respect the indicated dimensions it should not be covered with a slipp...

Page 9: ...ciently adequate conditions for the boiler room the hydraulic pipes and the other com ponents of the system 9 9Follow the instructions of the local gas suppliers 1 9 Hydraulic system Limescale and oth...

Page 10: ...ic diagram system for heating and domestic hot water production 1 11 Instructions for the connection of the fuel tank The dimensions of the fuel tank support structure should be ad equate for the dime...

Page 11: ...come under 0 5 m sec limit 2 m sec in the advised speed 1 13 Standard control panel of the boiler 1 Main ON OFF switch 2 Boiler thermostat from 30 to 90 C 3 Boiler thermometer 4 Safety thermostat with...

Page 12: ...3 41 4 91 6 00 8 63 5 25 7 56 7 53 10 85 10 22 14 72 12 91 18 59 Height of combustion gas pipe liquid fuel m 7 67 18 85 13 49 33 17 11 82 29 06 16 95 41 67 23 00 56 55 29 05 71 43 If the fuel is natu...

Page 13: ...erruption of current other faults or when the pumps are stopped protection pumps etc the burner should switch off The system should do this automatically Carry out the electrical wiring taking into ac...

Page 14: ...cal system All the boiler s gas and water valves should be open 9 9Check all the other connections according to the system s options 1 24 Boiler start up Engage the electrical supply using the master...

Page 15: ...nnection of the sensors Boiler combustion chamber and any formations of soot in the fume passages cleaning after checking Fastening and seal of the boiler door Seals of the boiler fittings Correct ope...

Page 16: ...ation When assembling the burner be careful not to leave any empty space between the front door and the body of the burner All the points of contact should be covered with insulating material to preve...

Page 17: ...EL BURNER BOILER BURNER MODEL CODE BOILER RTT 29 R40 D08 3481701 RTT 39 BOILER R40 D08 3481701 RTT 49 BOILER R40 D08 3481701 RTT 69 BOILER R40 D17 3482601 RTT 79 BOILER R40 D17 3482601 GAS BURNER BOIL...

Page 18: ...sealant wax silicon compounds For the measurements of the connection for the flue gases dis charge system see pag 8 1 34 Transport and storage The manufacturer transports the boiler on a pallet fixin...

Page 19: ...rmation Retailer Mr Address Tel Technical Assistance Centre Mr Address Tel Installer Mr Address Tel Date Intervention Fuel supplier Mr Address Tel Date Qty supplied Date Qty supplied Date Qty supplied...

Page 20: ...go VR Tel 0442630111 Fax 044222378 www riello it As part of the company s ongoing commitment to perfecting its range of products the appearance dimensions technical data equipment and accessories may...

Reviews: