background image

14

 

1.22 

Fire prevention regulations for the boiler 
room

The RTT boilers should be positioned and oriented carefully and 

in compliance with safety regulations.

During boiler installation and commissioning operations it is 

necessary to maintain a safety distance of 200 mm from inflam-

mable materials with class B, C1, C2 inflammability.

In the case of easily flammable materials with class C3 inflam-

mability, which burn rapidly and independently even after the 

removal of the ignition source, double the safety distance to 400 

mm.

The safety distance should be doubled also when the flamma-

bility class of the construction material has not been tested.

Flammability classes of 

the construction mate-

rials and products

Flammability classes of the mate-

rials and construction products

A - non-combustible 

Granite, sandstone, bricks, ceramic 

tiles, mortar, fire-proof plasters, ...

B - practically non-com-

bustible

Acumin, Izumin, Eraclit, Lignos, ba-

salt fibre panels and felt, fibreglass 

panels, ...

C1- difficult to ignite

Beech and oak, Hobrex panel, ply-

wood, Werzalit,……………..

C2 - normal 

combustibility

Pine, larch, white wood, panels of 

wood shavings and cork, rubber 

floors, ....

C3 - easily ignited

Tar-coated sheets, polyurethane, 

polystyrene, polyethylene, PVC, ....

NOTA: 

For more information please contact an authorised deal-

er

1.23 

Boiler checks and start-up

Preliminary checks

The following checks need to be carried out before starting the 

boiler. In the event of problems or faults, the boiler should not 

be started.

 

−  Adequately air the room.

 

− Check the level of water in the boiler. If the level is below 

the minimum, add the necessary amount of water.

 

− If the hydraulic system is leaking water, contact the tech-

nical assistance service, which will carry out repairs, and 

in any event carry out the repairs before starting the boil-

er.

 

− Check the connection between the fuel tank and the 

burner. In the event of leaks or faults restore the connec-

tion before starting the boiler. Clean the filters.

 

− if the boiler runs on gas, make sure that the tank is 

charged and check that the gas valves are open.

 

− If the boiler runs on liquid fuel, check the level in the fuel 

tank and make sure the fuel valve is open.

 

− Check the pumps are running and check their rotation 

direction.

 

− Check the control panel's electrical system.

 

− All the boiler's gas and water valves should be open.

 

9

Check all the other connections according to the system's 

options.

1.24 

Boiler start-up

 

− Engage the electrical supply using the master switch in 

the boiler room, the operating lamp will come on. 

 

− Start the circulation pump

 

9

It is mistaken to wait until the water temperature goes 

above 40°C before starting the pumps, the circulation pump 

and the burner should operate contemporaneously.

 

− Start the burner (carrying out the commands described in 

the burner's instruction manual).

 

− Set the temperature of the boiler between 30 and 90° C. If 

the burner is a two-stage burner, adjust the temperature 

of the second stage to 5-10°C less than that of the first 

stage. This will make the second stage lamp come on.

 

− If the burner does not start, follow the instructions in the 

burner's manual. If it is not possible to start the burn-

er after following the manual's instructions, contact the 

burner's technical assistance centre.

1.25 

Switching off the boiler

 

− Switch off the burner (carrying out the commands de-

scribed in the burner's instruction manual).

 

− Set the “ON/OFF” switch on the control panel to “OFF”.

 

− Switch off the circulation pump

 

− Close all the fuel valves.

 

− Switch off the electrical supply using the master switch in 

the boiler room.

1.26 

First checking of faults

When the burner or a boiler has a fault, check the following be-

fore calling for assistance. Do not carry out any other interven-

tion except for the controls indicated. After these checks, contact 

the technical assistance service.

 

− Check that the fuel is being correctly supplied to the burn-

er. If necessary, reconnect the fuel supply to the burner.

 

− Check that the pump is working. If the pump stops it could 

cause overheating. Contact the pump's manufacturer or 

distributor. If the boiler stops and does not restart, the 

stop could have been caused by the safety thermostat 

because of the overheating of the water in the boiler. In 

this case, wait for the boiler to cool down and carry out 

the following checks.

 

− Check the position of the valves. If the valves are closed, 

open them.

 

− Press the switch of the safety thermostat when the boiler 

has cooled down sufficiently, the burner should restart.

 

− If the burner does not start, or if the safety thermostat 

stops the boiler again, contact the technical assistance 

service.

 

− If the warning light of the burner is on, consult the burn-

er's instruction manual or contact the appliance's man-

ufacturer or dealer.

Summary of Contents for RTT 29

Page 1: ...cod Doc 0079317 rev 0 03 2016 RTT 29 79 EN INSTRUCTIONS FOR THE INSTALLER AND FOR THE TECHNICAL ASSISTANCE CENTRE...

Page 2: ...cally capable of carrying out routine maintenance keep it running at maximum efficiency with low running costs and which has original spare parts if required This instruction booklet contains importan...

Page 3: ...Instructions for use 13 1 20 Conveyance and discharge of the boiler water 13 1 21 Instructions for disposing of the product 13 1 22 Fire prevention regulations for the boiler room 14 1 23 Controls and...

Page 4: ...peciallyinsummer whentheboilerisoffforalongperiod to avoid problems of incrustation in the circulation pumps the boiler must be switched on 1 2 times a month and the circulation pumps operated for at...

Page 5: ...er increases The RTT 29 79 boilers are made of EN GJL 200 a special alloy that resists expansion and temperature variations which ensures a long working life Thanks to the vertical structures that hav...

Page 6: ...mm Water input output coupling G 1 1 4 DN Boiler volume gas side 24 20 33 40 42 60 51 80 61 00 70 20 dm3 lt 0 024 0 033 0 043 0 052 0 061 0 070 m2 Combustion chamber volume gas side 16 94 23 38 29 82...

Page 7: ...ER RTT 39 BOILER RTT 49 BOILER RTT 59 BOILER RTT 69 BOILER RTT 79 M mm 540 640 740 840 940 1 010 502 840 L M 1 6 Delivery The RTT 29 79 boilers are mounted on a wood pallet wrapped with Pluriball and...

Page 8: ...for the installation of the burner of the boiler Characteristics of the base it should be made of BS 25 fibre concrete it should respect the indicated dimensions it should not be covered with a slipp...

Page 9: ...ciently adequate conditions for the boiler room the hydraulic pipes and the other com ponents of the system 9 9Follow the instructions of the local gas suppliers 1 9 Hydraulic system Limescale and oth...

Page 10: ...ic diagram system for heating and domestic hot water production 1 11 Instructions for the connection of the fuel tank The dimensions of the fuel tank support structure should be ad equate for the dime...

Page 11: ...come under 0 5 m sec limit 2 m sec in the advised speed 1 13 Standard control panel of the boiler 1 Main ON OFF switch 2 Boiler thermostat from 30 to 90 C 3 Boiler thermometer 4 Safety thermostat with...

Page 12: ...3 41 4 91 6 00 8 63 5 25 7 56 7 53 10 85 10 22 14 72 12 91 18 59 Height of combustion gas pipe liquid fuel m 7 67 18 85 13 49 33 17 11 82 29 06 16 95 41 67 23 00 56 55 29 05 71 43 If the fuel is natu...

Page 13: ...erruption of current other faults or when the pumps are stopped protection pumps etc the burner should switch off The system should do this automatically Carry out the electrical wiring taking into ac...

Page 14: ...cal system All the boiler s gas and water valves should be open 9 9Check all the other connections according to the system s options 1 24 Boiler start up Engage the electrical supply using the master...

Page 15: ...nnection of the sensors Boiler combustion chamber and any formations of soot in the fume passages cleaning after checking Fastening and seal of the boiler door Seals of the boiler fittings Correct ope...

Page 16: ...ation When assembling the burner be careful not to leave any empty space between the front door and the body of the burner All the points of contact should be covered with insulating material to preve...

Page 17: ...EL BURNER BOILER BURNER MODEL CODE BOILER RTT 29 R40 D08 3481701 RTT 39 BOILER R40 D08 3481701 RTT 49 BOILER R40 D08 3481701 RTT 69 BOILER R40 D17 3482601 RTT 79 BOILER R40 D17 3482601 GAS BURNER BOIL...

Page 18: ...sealant wax silicon compounds For the measurements of the connection for the flue gases dis charge system see pag 8 1 34 Transport and storage The manufacturer transports the boiler on a pallet fixin...

Page 19: ...rmation Retailer Mr Address Tel Technical Assistance Centre Mr Address Tel Installer Mr Address Tel Date Intervention Fuel supplier Mr Address Tel Date Qty supplied Date Qty supplied Date Qty supplied...

Page 20: ...go VR Tel 0442630111 Fax 044222378 www riello it As part of the company s ongoing commitment to perfecting its range of products the appearance dimensions technical data equipment and accessories may...

Reviews: