9
3
Installation
3.1
Fixing to the boiler
Removal of the locking screws from the shutter
Remove the screws and the nuts 1)-2), before installing the
burner on the boiler. Replace them with the screws 3) M12
X 25 supplied with the burner.
T
he installation of the burner must be carried out by qualified personnel, as indicated in this manual and in compliance
with the standards and regulations of the laws in force.
1
2
1
2
3
3
D12015
Fig. 10
• Remove the stop pins 7) from the shutter and insert the supplied screws in their place.
• Prepare an adequate system of hoisting by hooking onto the rings 3).
• Slip the thermal protection (standard equipment) onto the blast tube 4).
• Place entire burner on the boiler hole arranged previously and fasten with the screws given as standard equipment.
The coupling of the burner-boiler must be air-tight.
1
1
6
5
6
2
4
3
3
20110636
Summary of Contents for DB 4 LSM C13
Page 2: ......
Page 61: ...1...
Page 69: ...9 3 3 1 1 2 3 M12 X 25 1 2 1 2 3 3 D12015 10 7 3 4 1 1 6 5 6 2 4 3 3 20110636...
Page 71: ...11 3 3 3 12 A A 8 10mm 4 4 5mm 12 D8665...
Page 72: ...12 4 4 1 1 2 3 3 3 4 1 6 13 1 3 4 5 D8416 2 6...
Page 73: ...13 4 4 2 D7543 C GF HPG LPG MM PA PGM PGm RG SRV VE VPS VR VS 0 5 4 bar 500 mbar 14...
Page 75: ...15 5 5 2 SQM 10 1 4 2 3 5 6 7 1 2 0 20 3 20 4 5 20 130 1 4 17 D1500...
Page 78: ...18 5 5 5 19 20 21 D2213 D2215 19 20 21 D2214...
Page 79: ...19 5 5 6 EN 267 20 A B D3509 22 2...
Page 83: ...23 7 7 1 UV 70 A 187 V 100 A c c 100 F 1V c c 7 2 1 2 3 4 5 1 2 3 4 5 6 D1143 31...
Page 86: ...26 7 VR VR VS VR...
Page 87: ...27 8 SQM 10 MB PA PGM PO SM TA TB UV UV VF VR VRS VS 3 5 6 7 6 3 2 8 5...
Page 89: ......
Page 90: ......
Page 91: ......