32
COMMISSIONING LOG FOR THE APPLIANCE
Modified service functions: (select the modified service functions and enter the values here).
Example: Vent Length Parameter changed from 1 to 2
Heating control:
Gas type setting (par 98 “Gas Type”)
�
NG |
�
LPG
CH set point (par. 3) :
DHW set point (par. 48) :
Other:
Heating control programmed, notes:
�
Documented the modified settings of the heating control in the control operating/ installation instructions
The following work has been carried out:
�
Electrical connections checked, notes:
�
Condensate trap filled
�
Carry out a combustion air/flue gas test
�
Proper operation of all modes and settings check carried out
�
Leak test carried out on the gas and water sides
�
Venting installed and secured properly per the vent manufacturer instructions
Commissioning includes checking the settings, a visual heating leak test and a functional check of the boiler and control. The system
installer conducts a test of the heating system.
This system has been checked to the extent described.
The documents have been handed over to the home owner/op-
erator. The home owner/operator has been instructed regarding
safety and operation of the boiler and accessories, including the
need for regular scheduled maintenance.
Name of service installing contractor
Date, owner/operator signature
Affix the test report here.
Date, system installer’s signature