![Riello 40 FS20 Installation, Use And Maintenance Instructions Download Page 37](http://html1.mh-extra.com/html/riello/40-fs20/40-fs20_installation-use-and-maintenance-instructions_1459953037.webp)
20014622
3
GB
TEST BOILER
The firing rate has been defined according to EN 676 standard.
COMMERCIAL BOILERS
The burner-boiler matching is assured if the boiler conforms to EN 303 and the combustion chamber
dimensions are similar to those shown in the diagram EN 676.
For applications where the boiler does not conform to EN 303, or where the combustion chamber is much
smaller than the dimensions given in EN 676, please consult the manufacturers.
CORRELATION BETWEEN GAS PRESSURE AND BURNER OUTPUT
To obtain the maximum output, a gas head pressure of 6.9 mbar is measured (
M2
, see chapter 3.3, page 4) with
the combustion chamber at 0 mbar using gas G20 with a net heat value of 10 kWh/Nm
3
(8,570 kcal/Nm
3
).
3.
INSTALLATION
THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.
3.1
BOILER FIXING
3
D5213
4
5
6
7
8
Thermal power
70,000
90,000
110,000
130,000
kcal/h
80
120
100
140
160
kW
180
170,000
200
220
150,000
190,000
Ga
s pre
ssu
re in
t
h
e
c
o
mbus
tion he
ad – mba
r
Boiler door must have a max. thickness of
100 mm
,
refractory lining included.
If thickness is greater
(max. 260 mm)
, a combustion
head extension must be fitted, which is supplied
separately.
IMPORTANT
Separate the combustion-head assembly
from the burner body by removing nut (1) and
removing group
(A)
.
Fix the head assembly group
(B)
to the boiler
(2) insert the supplied insulating gasket (3).
HINGE
S7393
ASSEMBLY
1
3
2
A
B
D5097