37
TYPICAL SYSTEM SCHEMATIC
Menu
Par.
No.
Description
Range
Default setting
INSIEME EVO
COND B/130 LN
UM
Access
2000
2027
Programmable input 2
0 = Disabled
1= Heating flow meter
2= Heating flow switch
3= Function not implemented
0…3
0
I
2000
2028
Programmable input 1
0= Disabled
1= Pressure transducer (with temporary or permanent
alarm)
2= Pressure transducer (without alarms) (*)
(*) Use only when the system is working at low pressure
(open tank systems)
0…2
1
I
2000
2029
Programmable input 8
0= Disabled
1= Heating pressure switch
0…1
0
I
2000
2030
Programmable output 1
0= Disabled
1= VIC (fuel shut-off valve) relay output on
0…1
1
I
2000
2031
Programmable output 3
0= Disabled
1= Remote alarm on
0…1
1
I
2000
2032
Programmable output 2
0= Disabled
1= 3-way valve with DHW storage tank before the separa-
tor
2= 3-way valve with instant DHW version
3= DHW storage tank pump (see label inside boiler electri-
cal panel)
0…3
1
I
2000
2033
Programmable output 4
1= Thermal unit pump
2= System pump
0…2
1
I
2000
2059 Minimum pump modulation value with central heating
heat request
0...Par. 2060
40
%
I
2000
2060 Maximum pump modulation value with central heating
heat request
Par. 2059...100
100
%
I
2000
2078
Set service hours countdown
0= Burner’s hours of operation
1 = Boiler’s hours of operation
0…1
0
U
2000
2079
Time delay on closing VIC (fuel shut-off valve)
When the burner goes off the VIC valve stays open for the
time set by this parameter
0…180
60
Sec.
I
2000
2080
Anti-legionella function
0 = deactivated
1 = daily
2 = weekly
0...2
2
I
2000
2088 Function not implemented
I
2000
2090
Venting function
0 = deactivated
1 = activated
0...1
1
I
2000
2091
Number of de-aeration cycles
Each cycle includes two ON/OFF sequences, each having 10
seconds ON and 10 seconds OFF.
Factory setting anticipates 2 de-aeration cycles every time
that the de-aeration function comes on.
1st cycle: the boiler’s 3-way diverter valve moves to the
central heating position and the boiler pump comes on
for 10 seconds, goes off for 10 seconds, comes back on for
10 seconds and then goes off again for 10 seconds. This
cycle lasts 40 seconds.
2nd cycle: begins at the end of the 1st cycle. The 3-way
diverter valve moves to the DHW position and the pump
repeats the same ON/OFF procedures as above, for a total
of 40 seconds.
0…255
2
I
2000
2092
Number of repetitions of de-aeration cycles
This parameter sets the number of repetitions for each
de-aeration cycle set in Par. 2091.
The sequence of de-aeration cycles is carried out for the
number of times set in this parameter.
Based on the factory settings of parameters 2091= 2 and
2092= 10, the total duration of the de-aeration function is
800 seconds (2 cycles of 40 sec. 10 times).
0…255
10
I