- 14 -
T
OWER VERSION
This chapter describes the steps for preparing the UPS and Battery Box for tower version use.
ATTENTION:
For your safety and that of the product, you must carefully follow the instructions given here below.
BEFORE YOU CARRY OUT THE FOLLOWING SEQUENCE OF OPERATIONS, MAKE SURE THAT THE
UPS IS COMPLETELY SWITCHED OFF AND NOT CONNECTED TO THE MAINS POWER SUPPLY OR
TO ANY LOAD
Once removed from the packaging, the UPS is already preset for installation in the tower configuration.
To complete the configuration, simply mount the UPS on the two support feet.
Each leg consists of three parts, connecting to each other at joints. To put a leg together proceed as shown in the
figure.
Assemble two legs and secure the UPS on top of them as shown in the figure below.