
1001 Bit Switch
009 Bit Switch 9
0
1
bit 0
PDL Auto Detection timeout of jobs submitted via
USB or Parallel Port (IEEE 1284).
0: Disable
(Immediately)
1: Enable
(10 seconds)
To be used if PDL auto-detection fails. A failure of PDL auto-detection does not
necessarily mean that the job cannot be printed. This bit switch tells the device
whether to time-out immediately (default) upon failure or to wait 10 seconds.
bit 1
DFU
-
-
bit 2
Job Cancel
0: Disable
(Not
cancelled)
1: Enable
(Cancelled)
If this bit switch is enabled, all jobs will be cancelled after a jam occurs.
Note: If this bit switch is enabled, printing under the following conditions might result
in problems:
- Job submission via USB or Parallel Port
- Spool printing (WIM >Configuration > Device Settings > System)
bit 3
DFU
-
-
bit 4
Timing of the PJL Status ReadBack (JOB END)
when printing multiple collated copies.
0: Disable
1: Enable
This bitsw determines the timing of the PJL USTATUS JOB END sent when multiple
collated copies are being printed.
0 (default): JOB END is sent by the device to the client after the first copy has
completed printing. This causes the page counter to be incremented after the first
copy and then again at the end of the job.
1: JOB END is sent by the device to the client after the last copy has finished printing.
This causes the page counter to be incremented at the end of each job.
bit 5
to 7
DFU
-
-
1001 Bit Switch
010 Bit Switch A DFU
-
-
Service SP Mode Tables
263
Summary of Contents for SP C440dn
Page 1: ...Model Z P2 Machine Codes M257 Field Service Manual April 2015...
Page 2: ......
Page 30: ...1 Product Information 28...
Page 73: ...9 Install the securing holder E 10 Reassemble the machine Tray Heater 71...
Page 86: ...3 Preventive Maintenance 84...
Page 92: ...5 Left cover B Right Cover 1 Open the duplex unit A 4 Replacement and Adjustment 90...
Page 128: ...5 Open the upper cover A 4 Replacement and Adjustment 126...
Page 131: ...4 The left stay A x 4 5 Rear holder bracket A x 2 Image Transfer 129...
Page 139: ...3 Remove the two screws 4 ID sensor board bracket A x 1 Image Transfer 137...
Page 141: ...4 Exit the SP mode Image Transfer 139...
Page 146: ...2 Temperature Humidity sensor A x 1 x 1 4 Replacement and Adjustment 144...
Page 187: ...3 Bracket A x 1 4 Release the paper feed unit A x 1 Paper Feed 185...
Page 201: ...5 Inner left upper cover page 94 6 Paper exit unit holder A x 1 Paper Exit 199...
Page 211: ...6 Release the left arm A x 1 Duplex Unit 209...
Page 215: ...3 Duplex lower guide plate A 4 Duplex upper guide plate A x 7 Duplex Unit 213...
Page 220: ...8 Right and left arms A x 2 each 4 Replacement and Adjustment 218...
Page 221: ...9 Duplex By pass motor bracket with the frame A x 6 10 Guide plate A x 4 Duplex Unit 219...
Page 230: ...Controller Box Removal E HVPS CB Board Right Cover Open F BCU 4 Replacement and Adjustment 228...
Page 245: ...5 Disconnect the connector 6 Disconnect the six connectors x 1 Electrical Components 243...
Page 254: ...4 Replacement and Adjustment 252...
Page 564: ...5 System Maintenance Reference 562...
Page 637: ...Model Z P2 Machine Codes M257 Appendices February 2015...
Page 638: ......
Page 640: ...2...
Page 648: ...1 Appendix Specifications 10...
Page 652: ...MEMO 14...
Page 653: ...MEMO 15...
Page 654: ...MEMO 16 EN...