Richter PSG/F series Operating Manual Download Page 17

Declaration about the Contamination of 
Richter Pumps, -Valves 
and Components 

Prepared: 

CRQ/Lam 

on:

 

Feb. 15, 06

 

Page:

 2 

QM

 

No.: 

0912-16-2001_en/4-

06

 

Approved:

 CRQ/Zu 

on:

 Feb. 

15, 

06

 

of

 

:

2

The repair and/or maintenance of pumps, valves and components can only be implemented if a completely filled out 
declaration is available. If this is not the case, delay of the work will occur. If this declaration is not attached to the 
devices, which have to be repaired, the transmission can be rejected. 

Every aggregate has to have it’s own declaration.

This declaration may be filled out and signed only by authorized technical personnel of the operator. 

 

Contractor/dep./institute : 

 

Reason for transmitting       

Please mark the applicable 

Repair:

 

subject to fee 

Warranty 

Street : 

 

Exchange:

 

subject to fee 

Warranty 

Postcode, city: 

 

Exchange/ Replacement already initiated/received 

Contact person: 

 

Return

:

Leasing 

Loan 

for credit note 

Phone : 

Fax : 

 

 

End user

 : 

 

A.  Details of Richter-product: 

 

Failure description: 

Classification:  

 

Article number: 

 

 

Equipment: 

Serial number: 

 

 

Application tool: 
Application process: 

B.  Condition of the Richter-product:

no

1)

 

yes 

  no 

 

Contamination : 

 

  no

1)

 yes 

 

Was it in operation ? 

 

toxic  

Drained (product/operating supply item) ? 

 

caustic  

All openings hermetically locked! 

 

inflammable  

Cleaned ? 

 

explosive

2)

 

If yes, with which cleaning agent: 

 

mikrobiological

2

)

and with which cleaning method: 

 

radioactive 

3)

 

1)

 if "no", then forward to

 D

.

other pollutant 

 

2)

 

Aggregates, which are contaminated with microbiological or explosive substances, are only 
accepted with documented evidence of an approved cleaning. 

3)

 

Aggregates, which are contaminated with radioactive substances, are not accepted in principle. 

 

C.  Details of the discharged materials (must be filled out imperatively) 

 

1.

 

With which materials did the aggregate come into contact

 ?

 

Trade name and/or chemical 

designation of operational funds and discharged materials, material properties, e.g. as per 
safety data sheet (e.g. toxic, inflammable, caustic)

 

X

Trade name: 

Chemical designation: 

 

a)  

 

b)  

 

c)  

 

d)  

 

no yes 

 

2.  Are the materials specified above harmful to health ? 

 

3.  Dangerous decomposition products during thermal load ? 

 

If yes, which ones ? 

 

D. Mandatory declaration:

We assure that the data in this explanation are truthful and complete and as a signatory I am 

able to form an opinion about this. We are aware that we are responsible towards the contractor for damages, which results 
from incomplete and incorrect data. We commit ourselves to exempt the contractor from claims for damages of thirds 
resulting from incomplete or incorrect data. We are aware that we are directly responsible towards thirds, irrespective of this 
declaration, which belongs in particularly to the employees of the contractor consigned with the handling repair of the product. 

Name of the authorized person 
(in block letters):

 

Date  

Signature 

 

Company stamp 

Summary of Contents for PSG/F series

Page 1: ...trictly observed before transport installation operation and maintenance Subject to change without notice Reproduction is generally permitted with indication of the source Richter Chemie Technik GmbH...

Page 2: ...osal 7 5 1 Storage 8 5 2 Return consignments 8 5 3 Disposal 8 6 Installation 8 6 1 Flange caps and gaskets 8 6 2 Direction of flow and installation position 8 6 3 Grounding 8 6 4 Test pressure 8 7 Ope...

Page 3: ...iagram in Section 1 3 Operating pressure DN 25 100 from vacuum to max 16 bar DN 150 200 from vacuum to max 10 bar See pressure temperature diagram in Section 1 3 Strainer size PSG F DN 25 40 50 65 80...

Page 4: ...O DIN drilled to ASME Class 150 Flange nom size Screws Tightening torque mm inch ASME Nm in lbs 25 1 4 x 8 70 40 1 4 x 15 135 50 2 4 x J 25 220 65 2 4 x J 30 265 80 3 4 x J 45 400 100 4 8 x J 35 310 1...

Page 5: ...tentially explosive areas see Section 3 Installation and operation are to be performed by qualified staff The area of responsibility authority and supervision of the staff must be regulated by the cus...

Page 6: ...2 1 of this operating manual The operation limits specified on the identification plate and in the pressure temperature diagram must under no circumstances be exceeded 3 Safety notes for applications...

Page 7: ...the temperature classes prescribed in the Annex are observed To achieve safe and reliable operation it must be ensured in inspections at regular intervals that the valve is properly serviced and kept...

Page 8: ...s Neutralise any medium residues in the valve Separate valve materials plastics metals etc and dispose of them in accordance with the local regulations 6 Installation Examine valve for in transit dama...

Page 9: ...sidual medium may still be found in the valve After dismantling immediately protect the valve flanges against mechanical damage with flange caps See also Section 6 1 8 Malfunctions Flange connection v...

Page 10: ...10 Drawing 10 1 Legend 100 body 106 cover 114 pane 408 seal 902 1 stud screw 920 1 hex nut 936 1 toothed lock washer Option Flexicord strip 981 1 Flexicord strip Option double glass pane 417 U seal 10...

Page 11: ...Series PSG F TSG F Page 11 9540 050 en Revision 10 TM 8361 Edition 10 2011 10 3 Sectional drawing PSG F 10 4 Sectional drawing TSG F Option Option...

Page 12: ...mm mm mm mm mm mm L 160 200 230 290 310 350 480 A 85 110 120 175 190 210 250 a 48 65 80 80 100 125 137 B1 ca 135 ca 155 ca 185 ca 194 ca 246 ca 294 ca 374 B2 ca 158 ca 182 ca 218 ca 289 ca 347 Option...

Page 13: ...sional drawing TSG F DN 25 50 80 mm mm mm D 115 165 200 L 160 230 310 a 48 80 100 b 80 115 155 B1 ca 135 ca 185 ca 246 B2 ca 158 ca 218 ca 289 Option Double glass panes Flange connecting dimensions DI...

Page 14: ...echnische Spezifikation AD 2000 Applied Technical Specification berwachungsverfahren 97 23 EG Surveillance Procedure Zertifizierungsstelle f r Druckger te der T V Nord Systems GmbH Co KG Notified Body...

Page 15: ......

Page 16: ...mination of the pumps valves and component sent in for repair On the basis of this information for the contractor is it possible to meet the necessary preventive action during the execution of the rep...

Page 17: ...logical 2 and with which cleaning method radioactive 3 1 if no then forward to D other pollutant 2 Aggregates which are contaminated with microbiological or explosive substances are only accepted with...

Page 18: ...IOSTOFFV the procedures for the prevention of accidents as well as regulations to environmental protection e g the Waste Management Law AbfG and the Water Resources Act WHG An inspection repair of Ric...

Reviews: