3
2.0 Installation and Setup
The following section provides detailed information on unpacking, inspection and setup of the SP2200, the
self-test pro ce dure, and in stal la tion of optional equipment.
2.1
Unpacking and Inspecting
Immediately after unpacking, perform a visual inspection of the SP2200. Notify the shipper and Rice Lake
Weighing Systems immediately if any damage oc curred during transportation.
Replace all packing materials, including the plastic bag and the cardboard insert, in the shipping carton. Store
the carton in a safe place so that it will available if the printer is relocated or returned for service.
Factory installation of some printer options, such as the switch module and the parallel interface, can be
verifi ed by visual inspection. For other options, such as the time and date module and the 20mA current loop
in ter face, use the self-test procedure described in Section 2.3 to verify installation.
2.2 Setup
Initial setup of the SP2200 consists of installing the print ribbon, setting the head gap, and running the printer
self-test. See Section 2.4 for information about installing optional equipment.
Before connecting the printer to a power source, check the operating voltage shown on the back panel of the
printer. Verify that the source voltage is within the operating range of the printer.
2.2.1 Installing the Print Ribbon
Use the following procedure to install print ribbon cartridges:
1. Turn off the printer. Open the print mechanism cover.
2. Use a pencil to pull a few extra inches of ribbon out of the ribbon cartridge (see Figure 2-1).
Figure 2-1. Use a pencil to pull extra ribbon from the cartridge before installing