MAINTENANCE
FR240-FR162 01/11
Maintenance Section 5-6
©2011 Alamo Group
MAINTENANCE
DRIVELINES
The Drivelines and U-Joints should be inspected each morning before the Cutter is started.
MntP-R-0456 and
Mnt-R-0457.
The U-Joint and CV Joint on the Driveline undergo extreme forces when the unit is turning or when the Wings
are being raised. It is important that the U-Joints and CV Joint be greased each day before the unit is started.
The U-Joints are located at each end of the Center and Wing Drivelines. The CV Joint is located at the end of
the Main Driveline. The U-Joint and CV Joint assemblies are accessible by rotating the Driveline Safety Shield
until the hole in the Shield matches up with the Grease Fitting. UseN.L.G.I. #2 Bearing Grease for lubrication.
Inspect the U-Joint for wear by holding the shaft on one side of the U-Joint while trying to rotate the shaft on the
other side of the U-Joint. If there is noticeable movement in the Driveline replace the U-joint before it causes
severe damage to the Driveline.
STANDARD
EXTENDED LUBE
LEVER
LOCATION
INTERVAL
INTERVAL ACTION PUMPS
Cross & Bearings
* 8 Hours
50 Hours
2 - 3
Telescoping Members
8 Hours
50 Hours
8 - 10
CV Ball & Socket (80º CV)
* 8 Hours
50 Hours
4 - 6
CV Center Housing (80º CV)
24 Hours
50 Hours
12 - 15
CE & Non-Rotating Guard Bushings
8 Hours
50 Hours
2
(1000 RPM MAX.)
* Constant Angle applications may require a Lube Interval of 4 hours.
ROTATING GUARD BUSHINGS SHOULD BE LUBRICATED UPON REPLACEMENT
80º CV DRIVELINE
TELESCOPING DRIVELINE
Summary of Contents for FR162
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION ...
Page 28: ...SAFETY FR240 FR162 01 11 Safety Section 1 18 2011 Alamo Group Inc SAFETY Decal Description ...
Page 29: ...SAFETY FR240 FR162 01 11 Safety Section 1 19 2011 Alamo Group Inc SAFETY ...
Page 30: ...SAFETY FR240 FR162 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY ...
Page 31: ...SAFETY FR240 FR162 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY ...
Page 32: ...SAFETY FR240 FR162 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY FR240 FR162 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY FR240 FR162 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY FR240 FR162 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY FR240 FR162 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY ...
Page 38: ......
Page 39: ......
Page 65: ......
Page 91: ...Introduction Section 2 1 2011 Alamo Group Inc INTRODUCTION SECTION ...
Page 96: ......
Page 97: ...Assembly Section 3 1 2011 Alamo Group Inc ASSEMBLY SECTION ...
Page 106: ......
Page 107: ...Operation Section 4 1 2011 Alamo Group Inc OPERATION SECTION ...
Page 157: ...Maintenance Section 5 1 2011 Alamo Group MAINTENANCE SECTION ...
Page 160: ...MAINTENANCE FR240 FR162 01 11 Maintenance Section 5 4 2011 Alamo Group MAINTENANCE ...
Page 176: ......
Page 190: ...Sección de Seguridad 1 1 2011 Alamo Group Inc SECCIÓN DE SEGURIDAD ...
Page 191: ......